深夜福利✅_临沂公社-艺文笔记

王金豹 2026年01月14日 23:26:14
发布于:曼谷

深夜福利✅_临沂公社_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in para. 3.

 TASK 34-41-00-810-801  Loss of the Weather Radar Information on the ND  1. Possible Causes_______________  - DMC-1 (1WT1)  - DMC-2 (1WT2)  - XCVR-WEATHER RADAR, 1 (1SQ1)  - CTL UNIT-WEATHER RADAR (3SQ)  - MTG TRAY-WR XCVR (9SQ)  - RADOME (1560WM)  R  - XCVR-WEATHER RADAR, 2 (1SQ2)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first  terminal block  - wiring from the DMC1 (1WT1) to the CAPT ND (3WT1)  - wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC2 (1WT2)  to the first terminal block  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to the first  terminal block  - wiring from the DMC2 (1WT2) to the F/O ND (3WT2)  - avionics ventilation  - wiring of the TR1 DATA BUS 1 OUTPUT and the TR1 DATA BUS 2 OUTPUT buses  from the weather radar transceiver 1 (1SQ1) to the first terminal block  - wiring of the weather radar control unit (3SQ)  - wiring of the weather radar transceiver mounting tray (9SQ)  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC1 (1WT1)  R  to the first terminal block  R  - wiring of the W/R SELECTED discrete from the DMC2 (1WT2) to first terminal  R  block  R  - wiring of the WR2 INPUT 1 and the WR2 INPUT 2 buses from the DMC2 (1WT2)  R  to the first terminal block  R  - wiring of the TR2 DATA BUS 1 OUTPUT and the TR2 DATA BUS 2 OUTPUT buses  R  from the weather radar transceiver 2 (1SQ2) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 31-63-34-000-001 Removal of the DMC (1WT1,1WT2,1WT3)  AMM 31-63-34-400-001 Installation of the DMC (1WT1,1WT2,1WT3)  AMM 34-41-00-730-001 System Test of the Weather Radar  AMM 34-41-00-740-002 BITE Test of the Weather Radar  AMM 34-41-12-000-001 Removal of the Weather Radar Control Unit (3SQ)  AMM 34-41-12-400-001 Installation of the Weather Radar Control Unit (3SQ)  AMM 34-41-33-000-004 Removal of the Weather Radar Transceiver (1SQ1, 1SQ2)  AMM 34-41-33-400-003 Installation of the Weather Radar Transceiver (1SQ1,

 1SQ2) AMM 34-41-37-000-001 Removal of the Weather Radar Transceiver Mounting Tray (9SQ) AMM 34-41-37-400-001 Installation of the Weather Radar Transceiver  Mounting Tray (9SQ)  AMM 53-15-11-000-001 Removal of the Radome  AMM 53-15-11-400-001 Installation of the Radome  ASM 31-61/04  ASM 34-41/01

 3. Fault Confirmation __________________  A. Test Do the system test of the weather radar (Ref. AMM TASK 34-41-00-730-001).  4. Fault Isolation _______________ R **ON A/C 001-049, 101-149, 151-199, 201-299, 301-399, 401-499,  A. If the weather radar display is not shown or incorrectly shown on the CAPT ND only: - on the center pedestal, on the SWITCHING panel 8VU, set the EIS DMC  selector switch to CAPT/3, and make sure that the weather radar display is correctly shown on the CAPT ND.  (1) If the weather radar display is correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).  (a) If the weather radar display is still incorrectly shown on the CAPT ND with the EIS DMC selector switch at NORM:  - do a check of the wiring of the WR1 INPUT 1 and the WR1 INPUT 2 buses from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞34-41-00∞∞∞∞∞∞∞∞∞∞Page 202  Aug 01/05 CES 1 If there is no continuity:

_ - repair the above wiring.  2 If there is continuity: _  - do a check and repair the wiring of the W/R SELECTED discrete from the DMC1 (1WT1) to the first terminal block (Ref. ASM 34-41/01).  (2) If the weather radar display is not correctly shown on the CAPT ND with the EIS DMC selector switch at CAPT/3:  - replace the DMC-1 (1WT1) (Ref. AMM TASK 31-63-34-000-001) and (Ref. AMM TASK 31-63-34-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 导航 NAVIGATION 3

原标题:
46 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 怀上二胎后, 家里的大宝到底该让谁帮忙带?

      24小时滚动播报最新的财经资讯和视频,更多粉丝福利扫描二维码关注(sinafinance)
  • 蒋飞:CPI回升符合季节性特征——2月通胀数据点评

      但3年后,锤子销量下滑,负债6亿。
  • 新国标不用驾照!一图读懂九号远行者F系列:单次充电最远能跑90km

      苏丹武装部队11日在社交媒体上表示,军方当天对驻扎在北喀土穆的苏丹快速支援部队发动袭击,摧毁7辆战车和2辆油罐车,打死车内人员,并缴获一批武器装备。
  • 蔚来亏损211亿:放弃幻想,过紧日子

      因为农夫山泉给人的印象就是:更纯净,更好喝。
  • 2024年1月日本有效求人倍率为1.27倍,与上月持平

      实际上,海底捞吃过直营的亏。疫情期间,海底捞在2021年一口气开了421家门店,但长时间的封控加上直营模式,所有门店租金、员工工资都要自己承担,带来巨大的经营压力,野蛮扩张之后,导致当年净亏损超41亿元。
  • 始祖鸟用户,不敢洗衣服

      “上家”还提醒北青报记者,在微博评论里售卖资源时,要学会用“暗语”,防止评论被屏蔽或被删除,“比如‘赞’,可以用表情,‘有资源’‘私信我’可以写成‘928(节目期数)已有’、‘丝我’。”
  • 降准是宽松措施但并非刺激政策

      比特币的飙升势头尚没有放缓的迹象,刺激市场的“好消息”又来。伦敦证券交易所3月11日宣布,将于2024年第二季度开始接受比特币和以太坊ETN的准入申请,确切日期“将在适当时候”公布。
  • 人类文明还剩多少年?

      这是迎合了大势的,近年来,多个自主品牌发布MPV车型,其背后是MPV市场的向好态势。其中,30万元以上的MPV上涨趋势明显。乘联会数据显示,30万以上MPV近两年年复合增长率为44%。
  • 体育总局公布首批群众“三大球”精品赛事案例:村超在列

      一周内三度刷新纪录,比特币的“疯狂”由哪些因素助推?市场普遍认为,“减半”是推动比特币价格上涨的重要因素。
  • 胜负彩23159期国内部分专业媒体复式推荐总汇

      “每次听到政府提倡‘买美国货’,都可以将其理解成‘我们要额外花钱’或‘我们要买质量次一等的产品’。”美国《洛杉矶时报》网站近日刊文称,让所有基建项目都用“美国制造”,是“针对美国消费者和纳税人的阴谋”。如今,“国家安全”被美国政府拿来作为保护高科技产业的理由。一些非重要行业也装作对国家安全至关重要,以获得特殊待遇,“这些做法都没有考虑经济因素”。
  • A股未来正进入震荡筑底阶段

      新MINIJCWCOUNTRYMAN的泼辣性格肯定离不开MINITwinPowerTurbo发动机,它实际上也与新的BMWX2M35i相同,但经过JCW专属调教,运动性能显著提升:相较于普通版车型,JCW对活塞、连杆和发动机支架进行了优化,并采用了高流量进气及先进涡轮增压器,目前这台2.0T发动机的最大功率达到221千瓦,峰值扭矩400牛·米,其中升功率达到150马力。新MINIJCWCOUNTRYMAN从静止加速100km/h时间仅为5.4秒。
  • 外媒称越南总理访澳是摆脱对华依赖的例证,外交部回应

      总体来看,中性名政策和冠名政策需要进一步完善,中国足协和中足联筹备组有必要和各方协商出台更加明确的规定:其一,必须使用单一的行政区划;其二,必须使用单一词组的中性名,不超过3个字;其三,必须使用单一词组的冠名,不超过3个字或相关规定的字符。在上述基础上,再来协商转播角标的问题,争取在限制字符的情况下尽可能维护冠名商权益,这是一个与时俱进但也需要充分沟通的过程。关键词:加载中点击加载更多
  • 山东大学将在济南章丘迁建主校区 校方:正磋商

      袁进辉形容这种感觉“像读了个研究生一样”。以王慧文为中心,人才、资本与商业力量交织在一点,能量密度在短时间提升至最高,作为当事者的袁进辉,自然见识良多。