国内精品♨️_精品免费产品综合精品-艺文笔记

王金豹 2026年01月13日 08:01:48
发布于:曼谷

国内精品♨️_精品免费产品综合精品_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

CHAPTER 77 - ENGINE INDICATING

 TABLE OF CONTENTS _________________  Chapter Section Subject_______ Subject ____ Effectivity _______ Page ___________  ENGINE INDICATING 77-00-00 _________________ Description and Operation 1 ALL General 1  Component Location 101 ALL  Component Index  Component Location

 POWER 77-10-00 _____ ENGINE PRESSURE RATIO INDICATING 77-11-00 SYSTEM  Description and Operation 1 ALL General 1 Indication - Engine Pressure 1  Ratio  Manifold - Engine Pressure 1  Ratio (PT4.95)  Probe - Engine Pressure Ratio 1  (PT4.95)

 Probe - EEC Total Inlet 1  Pressure/Temperature  (PT2/TT2)

 Operation 1 Adjustment/Test 501 ALL MANIFOLD - ENGINE PRESSURE RATIO 77-11-02  (PT4.95) Removal/Installation 401 ALL PROBE - ENGINE PRESSURE RATIO 77-11-01  (PT4.95) Removal/Installation 401 ALL Adjustment/Test 501 ALL Inspection/Check 601 ALL  77-CONTENTS  NGUN Page 1 Feb 18/02 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. ////////////////////////A / PW4000 SERIES /747-400 / ENGINES/MAINTENANCE MANUAL //////////////////////// CHAPTER 77 - ENGINE INDICATING

 TABLE OF CONTENTS _________________  Chapter Section Subject_______ Subject ____ Effectivity _______ Page ___________  ENGINE TACHOMETER SYSTEM 77-12-00  Description and Operation 1 ALL General 1 Alternator - EEC (N2 1  Transducer)  Indication 1  Speed Card - Engine 1  Transducer - EEC Speed (N1) 1  Operation 1

 Adjustment/Test 501 ALL CARD - ENGINE SPEED 77-12-01 Removal/Installation 401 ALL  TEMPERATURE 77-20-00 ___________ EXHAUST GAS TEMPERATURE INDICATING 77-21-00 SYSTEM  Description and Operation 1 ALL General 1 Cable - Thermocouple, EGT 1  (TT4.95)  Indication - Exhaust Gas 1  Temperature  Probe - Thermocouple, EGT 1  (TT4.95)  Terminal Box - EGT (TT4.95) 1  Thermocouple Cable

 Operation 5 Adjustment/Test 501 ALL BOX - TERMINAL, THERMOCOUPLE 77-21-04  CABLE, EXHAUST GAS TEMPERATURE  (TT4.95) Removal/Installation 401 ALL Inspection/Check 601 ALL Cleaning/Painting 701 ALL  CABLE - THERMOCOUPLE, EXHAUST 77-21-02  GAS TEMPERATURE (TT4.95) Removal/Installation 401 ALL Inspection/Check 601 ALL  77-CONTENTS  NGUN Page 2 Feb 18/02 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. CHAPTER 77 - ENGINE INDICATING

 TABLE OF CONTENTS _________________  Chapter Section Subject_______ Subject ____ Effectivity _______ Page ___________  Cleaning/Painting 701 ALL HOUSING - THERMOCOUPLE, EXHAUST 77-21-05  GAS TEMPERATURE (TT4.95) Removal/Installation 401 ALL Inspection/Check 601 ALL  PROBE - THERMOCOUPLE, EXHAUST 77-21-01  GAS TEMPERATURE (TT4.95) Removal/Installation 401 ALL Inspection/Check 601 ALL Cleaning/Painting 701 ALL  ANALYZERS 77-30-00 _________ AIRBORNE VIBRATION MONITORING 77-31-00 (AVM) SYSTEM  Description and Operation 1 ALL General 1 Accelerometer - Engine 1 Indication 3 Signal Conditioner - Airborne 3  Vibration Monitoring (AVM) Operation 3 Adjustment/Test 501 ALL  Universal Airborne Vibration 503  Monitor (AVM) Signal  Conditioner - Self Test

 Inspection/Check 601 ALL ACCELEROMETER - ENGINE 77-31-01 Removal/Installation 401 ALL CONDITIONER - SIGNAL, AIRBORNE 77-31-03 VIBRATION MONITOR Removal/Installation 401 ALL  77-CONTENTS  NGUN Page 3 Feb 18/02 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. ENGINE INDICATING - DESCRIPTION AND OPERATION _____________________________________________  1. General (Fig. 1 and 2) _______  A. The engine indicating system includes these systems:  (1)   Engine Pressure Ratio (EPR) Indicating System (AMM 77-11-00)

 (2)   Engine Tachometer System (AMM 77-12-00)

 (3)   Exhaust Gas Temperature (EGT) Indicating System (AMM 77-21-00)

 (4)   Airborne Vibration Monitoring (AVM) System (AMM 77-31-00)

 B. EPR Indicating System

 (1)   The engine inlet pressure (PT2) and the exhaust gas pressure (PT4.95) of the engine are sent to the electronic engine control (EEC) where actual EPR is computed and transmitted to the EFIS/EICAS interface units (EIU's) for display on the main EICAS display.

 C.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:747-400 AMM 飞机维护手册 发动机指示 ENGINE INDICATING

原标题:
61 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 大力推进颠覆性技术创新(创新谈)

      北京商报讯(记者刘洋刘晓梦)3月11日,极氪法务部官方微博发布声明称,极氪官方监测到,有人使用极易造成误解的“极氪编辑部@拓”账号,在社交媒体平台上转发传播一条虚假不良的视频内容。极氪当即通过相关渠道进行投诉与追究,目前该不良视频已被删除。
  • 圆脸怎样才能上镜不显胖?来和辛芷蕾学两招

      10月1日上午,机动侦查总队和亦庄派出所民警在亦庄公交沿线打扒巡控时发现两名形迹可疑的男子。民警一路紧盯跟控至南大红门公交站,当两名男子扒窃一名乘客手机时,被民警当场抓获。随后,民警从两名嫌疑人驾驶的汽车中当场查获被盗手机6部、钱包1个(内有他人身份证2张、银行卡数张)。
  • 兴业投资:脱欧谈判初步达成共识 英镑一飞冲天

      不论是品牌知名度、门店数,还是营收,海底捞都是火锅界的“一哥”,2023年预计净利润不低于44亿元,较2019年增长71.8%,远超疫情前水平,创历史新高。形势一片大好,海底捞为何突然选择了加盟这条路?
  • 以色列“狠虐” 叙利亚 纸黄金坐而待曙

      截至2024年1月末,本公司对参股公司提供的担保余额为90.79亿元,对子公司、子公司相互间及子公司对公司提供的担保余额为633.40亿元,合计担保余额为724.19亿元,占本公司最近一期经审计净资产的581.68%,占总资产的24.18%。公司及控股子公司逾期担保金额为333.10亿元。其中公司部分控股子公司因法院受理债权人重整申请,导致公司及控股子公司提供余额为9.63亿元的担保,存在被债权人追偿担保责任的风险。
  • 收盘:美股涨跌不一道指跌280点 市场聚焦银行危机

      广告声明:文内含有的对外跳转链接(包括不限于超链接、二维码、口令等形式),用于传递更多信息,节省甄选时间,结果仅供参考,IT之家所有文章均包含本声明。
  • 奥鹏教育举办"带娃毕业季" 激励学子从学历走向实力

      张女士称,事发后,她查阅资料发现,2021年10月,教育部、国家发展改革委、中国人民银行等六部门发布《关于加强校外培训机构预收费监管工作的通知》,要求“不得一次性收取或以充值、次卡等形式变相收取时间跨度超过3个月或60课时的费用”。2022年12月,教育部等十三部门印发《关于规范面向中小学生的非学科类校外培训的意见》,新增了一次性收费不得超过5000元的规定,防止一次性收费过多增加资金风险和家长负担。
  • 突然暴涨!又创历史新高

      海外的东北餐馆有话说
  • 任泽平:两会传递出新时代重大信号

      2022年开场,“经济分化”“贸易摩擦”“乌俄冲突”等局面接踵而至,对于建筑涂料行业而言,面临着“原材料上涨”“物流问题”“进出口贸易”等诸多困难,这是涂料行业各企业必须面临的全新挑战。
  • 期指主力空方“见好就收”

      2024年的一季度还没走完,新能源汽车行业已经打的不可开交。据不完全统计,节后复工半个月内,已经有13家车企官宣降价,涉及的具体车型高达上百款。
  • M1大幅上升之际如何资产配置

      其中,2月德系品牌零售份额20.5%,同比份额下降0.2个百分点;日系品牌零售份额14.4%,同比下降3.4个百分点;美系品牌市场零售份额达到6.4%,同比下降0.9个百分点。
  • 裁员30%!融资超10亿,烧不动了

      在黑龙江,多地以人工智能技术为支撑,实现对城市、重点景区及商圈的热度预报,配合客流疏导,及时回应游客关切,提升旅游高峰期管理效率和游客体验。
  • 中国体育报:排球联赛北京创举贡献全国

      这几乎是革命性的,在Agent日渐成熟的情况下,很多行业的许多环节都能够被改写,甚至取代。
  • 房价暴涨时应严厉打击囤地炒地

      而后行业急停。炙手可热的在线教育风口一下子成为一门股东不得参与分红、不能上市的生意。好未来、猿辅导、作业帮等头部公司不得不将主营业务剥离出去。