天堂岛精品🔇_天堂tv免费tv在线tv-艺文笔记

王金豹 2026年01月10日 23:04:59
发布于:曼谷

天堂岛精品🔇_天堂tv免费tv在线tv_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in Para. 3.  5. Close-up________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 239  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 2  1. Possible Causes _______________  - ELAC-2 (2CE2)

 - wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC2 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-2 (2CE2), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 241  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3

原标题:
84 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 首批中证A50ETF成立 约165亿增量资金来了

      底盘结构方面,风云T6采用的是前麦弗逊式+后多连杆独立悬挂的组合,在这个级别的电动车里这也是较为常见的搭配。因为重心低这一天生优势,它也有着很不错的的底盘质感,整体韧性的呈现是更多的,它应付路面的小坑洼和起伏过滤干脆也保留了很是清晰路感。而当遇上较高的减速带或者快速通过破碎路面时,它的化解能力依然值得肯定,贴地很好,车尾不发飘很听话。
  • 杭州:郁金香花海引客来

      习近平总书记强调,建设金融强国需要长期努力,久久为功。必须加快构建中国特色现代金融体系,建立健全科学稳健的金融调控体系、结构合理的金融市场体系、分工协作的金融机构体系、完备有效的金融监管体系、多样化专业性的金融产品和服务体系、自主可控安全高效的金融基础设施体系。由此可见,金融强国建设具有很高的标准和要求,不可能一蹴而就,需要长期开展一系列专业且艰苦的工作。金融强国建设目标是纲,各项任务是目,纲举必须目张。金融强国建设的核心任务是推进金融高质量发展。
  • 理想MEGA开局不利,其实跟外观没太大关系。

      现在距离Falcons官宣租借OleksandrKostyliev|s1mple的新闻已经过去两周多的时间了,而Falcons在BLASTPremier春季复活赛中也早早被淘汰。距离他们的下一场线下赛还有近两个月的时间,这让s1mple的未来悬而未决。要想继续职业生涯,s1mple将面临诸多不利因素。日前外媒分析了s1mple眼下的三个选择。
  • 张雪峰在衡水中学演讲:孩子不想读书,就带他去这四个地方看看

      (五)会议的召开方式:本次股东大会采用现场表决与网络投票相结合的方式。
  • 新疆维吾尔自治区高级人民法院原党组成员、副院长蒋新华接受审查调查

      耐心些吧,我宁愿整仓翻红的时间来得晚一些,也愿意股市向前慢进,走得扎实些。我经历了据说是股市最艰难的时期之一,希望我也能有幸接下来搭上股市的长期慢牛。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你海量资讯、精准解读,尽在新浪财经APP
  • 舒适家居快讯|因存在触电隐患,安徽多家取暖器被召回

      近日,多车企官宣降价,幅度从5000-35000元不等。机构认为,乘用车行业淘汰赛加速到来,行业集中度提升大势所趋。
  • 新自由主义可宣判死刑 之后的路该怎么走?

      当前,跨境电商已经成为全球贸易的一股新势力,我国网民规模突破10亿,是世界第一大网络零售市场,跨境电商增长尤为迅猛。
  • 小S穿拖鞋模仿梦露凹造型 身材玲珑有致似少女

      (小风)声明:新浪网独家稿件,未经授权禁止转载!热点栏目
  • 牙齿没了怎么办?老年人镶牙有三个选择

      如今,西海固地区的很多村庄几乎家家都已通上自来水。
  • 任泽平:科创板+注册制会成为中国版纳斯达克吗?

      官网于2024年1月31日发文显示,近日,在中国电信2024年65000套服务器操作系统集中采购项目中,超聚变以第一中标候选人身份成功中标,中标份额为50%。2023年12月22日,超聚变官网显示,超聚变服务器操作系统FusionOS与腾讯云、华为云、天翼云、联通智网、、华宇信息、眸视科技等16家生态伙伴的软件产品完成生态互认证。
  • 首家无人银行来了!没有工作人员 什么业务不能办?

      近年来,扩大加盟俨然成了餐饮行业新时尚,从传统餐饮到新茶饮,纷纷扩军。今年2月4日,港股上市餐饮品牌“九毛九”宣布将陆续放开旗下太二酸菜鱼、山的山外面酸汤火锅的加盟合作。而在此之前不久,老乡鸡、奈雪等各餐饮细分赛道企业相继发力加盟。
  • 新晋辣妹装潮牌BF,加速开店的同时还准备卖咖啡

      皇家加勒比的首席信息官JaySchneider认为它们是一个‘兼具动与静’的品牌,抱着这样的设计理念,海洋标志号的娱乐空间形成了动静兼具的八大主题。
  • 2018年高考志愿填报:同分/同位次考生去向查询

      而提早布局装配式装修的家居品牌运营商,华耐家居首席战略官文军认为,目前各个行业都在“卷”,但“卷”也会带来更多分化的商业新型业态。家居企业便需要做到以下三点:一要“在场”,活着是一个企业最高的发展战略;二要创新,在渠道、流量等多方面实现创新;三要“抓住微光”,看到更多新涌现的机会,从而创造更大的机会。