国产自拍👅_亚洲mv清砖码区小说-艺文笔记

王金豹 2026年02月05日 04:11:41
发布于:曼谷

国产自拍👅_亚洲mv清砖码区小说_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

H. Put the Airplane Back to Its Usual Condition SUBTASK 27-11-41-410-001 (1) Close this access panel: Number Name/Location 112A Forward Access Door SUBTASK 27-11-41-860-003 (2) Do this task: Put the Aileron Hydraulic Systems A and B Back to the Condition Before Pressure Removal, TASK 27-11-00-860-802. ------------------------- END OF TASK --------------------------- 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-41 Page 410 Feb 10/2007 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details AILERON CONTROL WHEEL DRUM - REMOVAL/INSTALLATION 1. General A. This procedure has these tasks: (1) A removal of the aileron control wheel drum (2) An installation of the aileron control wheel drum. B. The aileron control wheel drum is referred to as the "control wheel drum" in this procedure. C. The control wheel drum is installed at the base of the captain’s control column. TASK 27-11-51-000-801 2. Aileron Control Wheel Drum Removal (Figure 401) A. References Reference Title 27-11-00-860-801 Remove Pressure from the Aileron Hydraulic Systems A and B (P/B 201) B. Tools/Equipment NOTE: When more than one tool part number is listed under the same "Reference" number, the tools shown are alternates to each other within the same airplane series. Tool part numbers that are replaced or non-procurable are preceded by "Opt:", which stands for Optional. Reference Description SPL-1585 Kit - Rigging Pins, All Systems (Part #: F70207-109, Supplier: 81205, A/P Effectivity: 737-600, -700, -700C, -700ER, -700QC, -800, -900, -900ER, -BBJ) C. Location Zones Zone Area 112 Area Forward of Nose Landing Gear Wheel Well 133 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Left 134 Main Landing Gear Wheel Well, Body Station 663.75 to Body Station 727.00 - Right 211 Flight Compartment - Left 212 Flight Compartment - Right D. Access Panels Number Name/Location 112A Forward Access Door E. Prepare for the Removal SUBTASK 27-11-51-010-001 (1) Open this access panel: Number Name/Location 112A Forward Access Door 737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL EFFECTIVITY GUN ALL 27-11-51 Page 401 Oct 10/2006 D633A101-GUN BOEING PROPRIETARY - Copyright#Unpublished Work - See title page for details SUBTASK 27-11-51-860-001 WARNING: MAKE SURE THE DOWNLOCK PINS ARE INSTALLED ON ALL THE LANDING GEARS. WITHOUT THE DOWNLOCK PINS, THE LANDING GEARS COULD RETRACT AND CAUSE INJURIES TO PERSONS AND DAMAGE TO EQUIPMENT. (2) Do this task: Remove Pressure from the Aileron Hydraulic Systems A and B, TASK 27-11-00-860-801. SUBTASK 27-11-51-860-002 (3) Put the captain’s and first officer’s control wheels in the neutral position. SUBTASK 27-11-51-480-001 (4) Install the rig pins A/S-1 and A/S-1A, from the rig pin kit, SPL-1585, in the aileron transfer mechanism. (a) Make sure that the rig pin A/S-1 is fully in the aileron transfer mechanism. (b) Hold the rig pin A/S-1 to make sure it does not fall out. SUBTASK 27-11-51-480-002 (5) Install the rig pin A/S-15, from the rig pin kit, SPL-1585, in the aileron trim mechanism. F. Aileron Control Wheel Drum Removal SUBTASK 27-11-51-020-001 (1) Disconnect the cable ACBA [1] and cable ACBB [2] at the turnbuckles [3]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-002 (2) Disconnect the cable AA [4] and cable AB [6] at the turnbuckles [5]. (a) Attach identification tags on the disconnected cables for easier assembly. SUBTASK 27-11-51-020-003 (3) Remove the cable guide [16] from the control wheel drum assembly [19]. (a) Remove the screws [17] from the cable guide [16]. (b) Remove the cable guide [16]. SUBTASK 27-11-51-020-004 (4) Remove the control wheel drum assembly [19]: (a) Remove the screw [35] and clamp [37] that attach the rudder pedal adjustment crank to the control wheel drum assembly [19]. (b) Remove the screws [24], [27], [39] and clamps [26], [29] and [41]. (c) Disconnect the electrical connectors [15] and [30] from the roll force transducer [18]. (d) Remove the screws [31], washers [32] and nuts [34] to remove the wiring harness [38] from bracket on the control wheel drum assembly [19]. (e) Disconnect the electrical connector [33] from the aileron transmitter. (f) Remove the nuts [14], washers [13], and bolts [12] that attach the control wheel drum assembly [19] to the airplane structure.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-600/700/800/900 AIRCRAFT MAINTENANCE MANUAL飞机维护手册2

原标题:
30 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 摩根大通策略师:英伟达等美国“科技七巨头”的估值远未达到顶峰

      营业收入的大幅下滑,是公司2023年亏损加剧的最主要原因。
  • 世界上最古老的树生长在智利峡谷 树龄可能超过5000岁

      从球队来看,各队均有较大提升,总跑动距离上,2024赛季首轮16支球队全部超越了2023赛季平均的.93米。跑动数据最高的上海海港,在揭幕战中总跑动距离达到.46米,高强度跑达到11204.32米。
  • 英国大量金融从业人员面临失业

      后排支持4:6可放倒座椅,增大行李箱空间,可拓展至1320L。
  • 黄金出现买入信号,第一目标见1208.32

      大多数苹果手机的用户都习惯于在他们的iPhone上启用FaceID的注册过程,用户需要在其中将头转向一个方向,然后转向另一个方向,然后上下转动,依此类推。
  • SHEIN被指已完成20亿美元融资,估值下降近400亿

      强化金融风险防范为金融强国建设保驾护航。防控风险是金融工作的永恒主题。当前,我国金融领域各种矛盾和问题相互交织,相互影响,经济金融风险隐患仍然较多,要以防范化解风险为重点,牢牢守住不发生系统性金融风险的底线。未来应积极应对以下五方面风险。一是由于中长期国内房地产市场供需结构发生了很大变化,防范化解房地产金融风险应放在更加重要的位置。二是在房地产市场下行和土地出让金大幅下降的背景下,地方债务压力凸显。未来需要建立防范化解地方债务风险长效机制,建立同高质量发展相适应的政府债务管理机制。三是中小金融机构资产规模小,抗风险能力弱,面对冲击时往往容易出现流动性风险。有必要完善中小金融机构风险监测评估和预警,着力强化早期纠正硬约束,推动高风险中小金融机构兼并重组,该出清的稳妥出清。四是针对非法集资、欺诈销售、操纵市场、信息泄露等违法违规行为,应严厉给予打击。五是要在调节市场供求关系的同时,着力稳预期、防超调,发挥市场供求关系在汇率形成中的决定性作用,审慎合理运用相关市场调节工具,防范跨境资金异常波动风险,保持外汇市场平稳运行。
  • 俄超男排别尔哥罗德豪取12连胜 张景胤14分得分王

      2、本次审议通过的控股子公司对参股房地产项目公司担保额度为预计担保额度,将根据参股房地产项目公司融资等情况决定是否予以实施。本次公司控股子公司原则上与其他股东根据合资合作协议的约定,按公司持股比例对参股房地产项目公司提供担保。如根据金融机构要求,公司控股子公司超过公司持股比例提供担保,为进一步防范担保风险,在提供担保后将要求其他股东或者参股房地产项目公司提供反担保。截至目前,本次预计的担保事项尚未发生,担保协议亦未签署。担保事项实际发生后,公司将按照信息披露的相关规定,及时履行信息披露义务。
  • 小编寄语

      提出的很多教育建议已被采纳,倍感自豪和责任重大
  • 豆瓣评分跌至5.6 吴京怪兽新片《巨齿鲨2:深渊》票房破5亿

      (现在大多人对他的印象就是“唯一的姐”热梗创始人。这次古装上了热搜,才知道早两年他竟还搭宋伊人演过戏。)
  • 疫苗事件和医药监管

      特此公告。
  • 任泽平:美股暴跌 特朗普景气或终结?美国经济或见顶?

      问:您在建议中提出,要改善教育负担过重,多元化的评价体系和招生政策是关键,您能具体讲一讲吗?
  • 惠达卫浴“卷”起智能马桶普及风暴,底气何来?

      对于撤柜行为,深圳市丰巢科技有限公司官方账号回应称移机属于智能快递柜优化资源的正常运营行为。上述视频中的柜机是位于深圳福田区“一拖三”柜机,为了优化深圳地区丰巢柜机服务,进行一组副柜移机,剩余柜机仍保持正常服务。
  • 建校以来首位:28岁女博士获聘山东农业大学教授

      对于这个十分钟的小片段表演,四位越剧演员在北京京剧院一起排练了至少四天。何赛飞细致地给金镶玉这个人物的出场设计了眼神以及用屁股推门的动作,还跟导演沟通要注意给到这个动作的镜头特写。对于金镶玉的手帕,她坚持不要方的要长的,这些都是塑造好一个时不时要干活的老板娘的细节。何赛飞还参与了服装的设计,给表演服增加了色彩上的渐变。