糖心logo官网✅_丰满人爽人妻A片二区-艺文笔记

王金豹 2025年11月12日 11:57:14
发布于:曼谷

糖心logo官网✅_丰满人爽人妻A片二区_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Installation of the PTU Manifold CAUTION : USE A SECOND WRENCH TO APPLY COUNTERTORQUE TO THE UNION WHEN _______ YOU DISCONNECT/CONNECT HYDRAULIC LINES ON UNIONS. IF YOU USE THE SECOND WRENCH, YOU WILL NOT LOOSEN OR TIGHTEN THE UNION TOO MUCH.  CAUTION : YOU MUST INSTALL HYDRAULIC TUBES WITH HYDRAULIC FLUID AS _______  LUBRICANT.

 (1)  Remove the sealant from the mating surface of the manifold (7) and the aircraft structure with a plastic or wooden scraper.

 (2)  Clean the component interface and/or the adjacent area.

 (3)  Do an inspection of the component interface and/or the adjacent area.

 (4)  Examine the structure of the aircraft in the area of the manifold attachment for cracks, corrosion or other damage.

 (5)  Apply a layer of SEALANTS (Material No. 09-018) to the mating surface of the manifold (7).

 (6)  Put the manifold (7) in position on the aircraft and install the bolts (1) and the washers (2). Do not tighten the bolts (1).

 (7)  Remove the blanking plugs from the pipe end-fittings and the unions on the manifold (7).

 (8)  Make sure that the hydraulic line end-fittings are serviceable.

 (9)  Apply HYDRAULIC FLUIDS (Material No. 02-003) to the threads of the line end-fittings.

 (10)  Connect the pipe (11) to the union (13).

 (11)  TORQUE the pipe end-fitting (12) to between 9.7 and 10.7 m.daN (71.53 and 78.90 lbf.ft).

 (12)  Connect the pipe (21) to the check valve 3093GM.

 (13)  TORQUE the pipe end-fitting (22) to between 12.9 and 14.2 m.daN

 (95.13 and 104.71 lbf.ft).

 (14)  Connect the pipe (48) to the union (50).

R 1EFF : 059-099, 102-105, 151-152, 201-206, 1 29-13-15Page 420 1 1 May 01/05 1 1 1CES 1

 (15)  TORQUE the pipe end-fitting (49) to between 1.5 and 1.7 m.daN (11.06

 (16)  Connect the pipe (3) to the reducer (5).

 (17)  TORQUE the pipe end-fitting (4) to between 5.4 and 5.9 m.daN (39.82 and 43.51 lbf.ft).

 (18)  Tighten the bolts (1).

 (19)  Make sure that the isolation coupling (45) engages correctly in the coupling half (46).

 (20)  Remove the blanking caps from the electrical connectors.

 (21)  Make sure that the electrical connectors are clean and in the correct condition.

 (22) Connect the electrical connector (29) to the PTU solenoid valve. R **ON A/C 001-049, 051-058, 101-101, R Post SB 29-1094 For A/C 001-049,051-058,101-101,  Subtask 29-13-15-560-050-D  A. Preparation of the Replacement Component  (1) Remove the components which are attached to the removed manifold (7) as follows:  (a)  Remove the PTU solenoid valve 3012GL (Ref. TASK 29-23-51-000-002).

 (b)  Remove the priority valve 3064GM (Ref. TASK 29-13-33-000-001).

 (c)  Remove the bobbins (9),(30) (Ref. TASK 20-23-21-911-001).

 (d)  Remove and discard the following items from the bobbins:

 -square section seals (10),(31),  -back-up rings (36), (37), (39), (40) and  -O-rings (35), (38).

 (e)  Put the bobbins (9),(30) into plastic bags to keep them clean.

 (f)  Remove the check valve 3093GM and discard the O-ring (23).

R 1EFF : 001-049, 051-099, 101-105, 151-152, 1 29-13-15Page 421 1201-206, 1May 01/05 1 1 1CES 1

 (g) Remove the check valve 3094GM as follows:

 1_ Cut, remove and discard the lockwire.  2_ Remove the check valve 3094GM and discard the O-rings  (15),(16) and the back-up rings (41).

 (h)  If necessary, remove and discard the lockwire from the coupling half (46) and the manifold (7).

 (i)  Remove the coupling half (46) and discard the packing (47).

 (j)  If necessary, remove the reducer (5) and discard the packing (52).

 (k)  If necessary, remove the union (13) and discard the packing (53).

 (l)  Install the blanking plugs on the open ports of the manifold (7).

 (m)  Install the blanking plugs on all of the removed components.

 (2) Install the removed components on the replacement manifold (7) as follows:  (a)  Remove the blanking plugs from the manifold (7) and the components.

 (b)  Lubricate the new O-rings and the threads of the components with HYDRAULIC FLUIDS (Material No. 02-003).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压4

原标题:
73 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 安德利产销量停滞:分红率低大量资金用于投资 IPO募资必要性存疑

      (修楚)声明:新浪网独家稿件,未经授权禁止转载!
  • 对放开二孩不必期望过高

      内饰创意很强,很有质感
  • IBA庆团结日强调主席功绩 官宣千万美元赛事计划

      造车新势力中,理想汽车2月共交付新车20251辆,同比增长21.8%,环比下滑35%。3月1日,首款纯电产品理想MEGA正式上市,新车售价为55.98万元,电池搭载麒麟5C芯片容量为102.7kWh,CLTC纯电续航达到710km。
  • 夏季补水 如何选择合适的乳液

      “人体的免疫系统包含固有免疫和适应性免疫两部分。”曾玫教授解释,“固有免疫是人体的第一道免疫防线,这是我们每个人与生俱来的。例如,健康的皮肤和呼吸道黏膜组织可以将病原体抵挡在身体之外,呼吸道正常的分泌物中也含有抵御病原菌的免疫物质;而在适应性免疫中,发挥作用的主要是人体的T免疫细胞和B免疫细胞。这些细胞在接触病原等刺激后,会产生抗体等免疫物质来帮助我们抵御感染。”
  • 网友反馈:iOS 15.5系统“时间与地点”服务偷跑大量流量

      ‘邮轮体验中,经常被忽视但又很重要的部分,是登船的过程——以往的邮轮设计为了方便游客直达房间,会把电梯放在离入口最近的地方,然而这样没有窗户(看不到邮轮全景)的路,很像在机场过关’。
  • 孩子喜欢偷东西怎么办?

      此外,表示曾在求职中被问及婚育的受访女性占比为48.8%,相比去年的61.1%明显下降。新版《妇女权益保障法》规定,有“除个人基本信息外,进一步询问或者调查女性求职者的婚育情况”行为的,由人力资源和社会保障部门责令改正,新法实施一年来对女性权益保护起到了积极作用。
  • 欧元区经济已形成货币依赖

      同时红色刘海边夹这些小小装饰品也是非常点睛之笔的!
  • 消息面变量有限 期指震荡蓄势

      此前,理想MEGA因被恶意P图并吐槽“像棺材”而在网络上引发热议,传播速度惊人。有媒体观察发现,其中疑似有水军推波助澜,表现为在社交媒体上搜索MEGA时,部分评论虽用户名各异,但话术高度一致。在如此争议之下,MEGA面临大量用户退订、销量远低于预期等传闻,这些声音不断扩散、发酵。
  • 任泽平:中国经济正站在产能新周期底部和金融周期顶部

      “戚老师太为事业而不顾一切了,因为我不是这样的人,所以直觉让我不喜欢,但是这种不喜欢肯定不会完全取代所有,我同时觉得这是一个好的创作机会,这个矛盾心理肯定是有的,但是至今为止我还是不太喜欢戚老师。”
  • 股市趋势性机会尚需耐心等待

      这种炸弹不仅可以由战机投掷,也可以由“龙卷风”-S或其他能发射直径30厘米弹药的多管火箭炮发射。弹药名称中“多军种”的含义正在于此。
  • 中方将参加“安全纽带

      习近平特别提出,把握新兴领域发展特点规律,推动新质生产力同新质战斗力高效融合、双向拉动。
  • 金鹏辉:加快推进《反洗钱法》审议和发布

      Schiller的优势在于他不是高级副总裁:他是AppleFellow(苹果伙伴),这意味着他在公司内的角色不是很多。这可能对Schiller有利,因为这意味着他可以更轻松地担任首席执行官一职,而不会影响其他高管的职位。
  • 女霸总亮相 关晓彤戴墨镜穿黑西装又酷又飒

      问:我们发现,有些学校重视素质教育后,学生反而更累了。以前只需要好好考试,现在还要同时学体育、乐器。随着评价标准的多元,竞争也变得多元,这种情况要如何避免呢?