天堂岛精品🔇_红杏直播-艺文笔记

王金豹 2025年11月16日 01:51:13
发布于:曼谷

天堂岛精品🔇_红杏直播_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 31-63-22-020-052  B. Removal of the ND CAPT (3WT1)  (1)  Push in the two locking catches (4).

 (2)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (3)  Slowly and continuously lower the handle (4) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 412 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (4) Pull the handle (3) found at the removal point and disengage the unit

 (2).  (5)  Remove the unit (2). Subtask 31-63-22-420-051

 C.  Installation of the ND CAPT in place of the PFD CAPT

 (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the PFD just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

 Subtask 31-63-22-020-053  D. Removal of the upper ECAM DU (4WT1)  (1)  Remove the thermoformed cover from the center instrument panel.

 (2)  Push in the two locking catches (4).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 413 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1

 (3)  If necessary, push up the handle (3) to decrease the load applied to the locking catches (4): the handle falls to the level of the studs.

 (4)  Slowly and continuously lower the handle (3) to the bottom section of the screen: at the same time, the unit (2) moves out from the panel by approximately 3 cm.

 (5)  Pull the handle (3) found at the removal point and disengage the unit (2).

 (6)  Remove the unit (2).

 Subtask 31-63-22-420-052  E. Installation of the upper ECAM DU in place of the ND CAPT  (1)  Clean the component interface and/or the adjacent area.

 (2)  Do an inspection of the component interface and/or the adjacent area.

 (3)  In the housing (8), make sure that:

 - the ventilation air inlet (7) is in the correct condition (flexible seal installed and duct not blocked)

 - the locking studs (5) and the movable locking hooks (6) are not damaged.

 (4)  Make sure that the electrical connectors are clean and in the correct condition.

 (5)  Install the unit (2) in the panel opening previously fitted with the ND just removed. Fully move down the handle (3) to the bottom of the screen.

 (6)  Push the unit until the locking studs (5) touch the movable locking hooks (at this time, the face of the unit must be out of the panel by approximately 3 cm).

 (7)  Push the two sides of the unit (2) to connect the electrical connector (1). Let the handle (3) move up freely until it is at the level of the locking catches (4) (the unit is now in line with the panel).

 (8)  Slowly and continuously move the handle (3) to its maximum position. In this position the two locking catches (4) are locked under the handle (3).

R 1EFF : 001-049, 051-099, 101-149, 151-199, 1 31-63-22Page 414 1201-299, 301-399, 1Aug 01/05 1 1 1CES 1 Subtask 31-63-22-020-054

 F. Removal of the ND F/0 (3WT2)  Remove the thermoformed cover from the F/O main instrument panel.

 (1)  Push in the two locking catches (4).

 (2)   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 指示/记录系统 8

原标题:
91 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 中国利率市场现状:七大利率如何传导?

      现在,校园生活确实不太一样了。课外补习班少了、兴趣活动变多了、考试不搞排名了……可是,教育焦虑却始终存在。
  • 国产大模型落地,等一个“Sora时刻”

      由全国工商联家具装饰业商会、中质网、新浪家居联合发起的中国家装百强调研活动从5月26日正式启动。截止8月10日,先后走访湖南省长沙市,重庆市,广东省广州市、深圳市,北京市,广西壮族自治区南宁市,走访家装品牌企业35家,走访城市楼盘66个,实地走访调研在施工地121个,其中随机走访在施工地53个,涉及家装企业46家(含35家定向走访家装百强企业)。
  • 哈姆西克转会一方获实锤!自传披露为了赚钱来中国

      当时,选择辅助驾驶路线的企业主要以传统车企为主,因为这类技术能够更快应用到车辆上,为产品体验带来革新。
  • 汽车废塑料可以巧变石墨烯

      最近这几年,何赛飞的戏约又多了起来,不仅到了演主角妈妈的好年纪,对于外婆、奶奶这些角色,她也不抵触,最近在新剧《承欢记》中,何赛飞就出演了杨紫的妈妈。对于和杨紫这样年轻一代演员的合作,何赛飞说,“我们是相互学习,年轻演员身上有一些优点,我们也要学习,他们都很努力都很负责,前些年可能有一些说法,说年轻演员有怎么样的问题,但那是少数的,大多数年轻人都很负责。”
  • 建发·观堂府

      欧洲
  • 白糖商品报价动态(2024

      苹果作为全球最顶尖的科技企业,在这种时候自然承认自己不行,所以也一头扎进了L5的路线当中。
  • 网友造谣南京禄口机场遣返四川籍乘客被行政拘留

      不过与Falcons延长租借期也有一个明显的问题,那就是比赛机会很少。在夏季休赛期之前Falcons还有EPL和IEM达拉斯站可以参加,两场赛事加起来最多有7场对局可打。但如果Falcons在这两场赛事中都表现平平,那么意味着s1mple在半年内的正式比赛对局将不到10场,这个数字实在是太少了。
  • 多重行业维度下,如何定义可持续鞋履?

      票价和时间成本,依然是邮轮走向大众的两大门槛,但一种新型的旅游路线乃至生活方式,已经加入了许多人的待办事项。
  • 修行应一门深入还是多看经典

      作为理想汽车旗下的首款MPV及纯电车型,MEGA仅有55.98万元一个版本,不过李想坚信这款车型将成为公司的下一个热销产品,并有决心在50万元以上的市场中夺取销量第一的地位,挑战单月8000辆的惊人销量。
  • 全球市场应减少对货币政策的依赖

      巨大的烟囱,明媚的阳光,起航中的邮轮展现出一幅令人印象深刻的景象。英国卡纳德邮轮公司(Cunard)的卢西塔尼亚号皇家邮轮(RMSLusitania)配备了与其对手不同的新型发动机,并将打破跨洋航行的最快纪录,而且不是一次打破,是两次。
  • 一二线房价将进入缓慢上涨阶段

      拜登预算案中的预期数字在去年11月就已敲定,当时美国还没有公布强劲的2023年GDP数据。
  • 哈勃望远镜捕捉到遥远宇宙漂流的“对虾星云”

      赛时被说是从漫画里走出来的美少年。
  • 卢布汇率逆袭:俄正抑制升值

      该楼盘户型含109~170㎡,适合意向定居丰台的刚改、改善购房人群
  • 潮州市城区36条道路完成路树迁移 将补植这些树种

      策略师上周也表示,尽管美国股市的集中度达到了几十年来的最高水平,但顶级股票的估值远低于科技股泡沫顶峰时期的大型股票。