在线看免费❗_午夜av一区二区-艺文笔记

王金豹 2026年01月21日 22:46:46
发布于:曼谷

在线看免费❗_午夜av一区二区_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in Para. 3.  5. Close-up________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 239  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 2  1. Possible Causes _______________  - ELAC-2 (2CE2)

 - wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC2 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-2 (2CE2), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 241  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3

原标题:
60 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 雕塑手术,凹凸不平和松弛真的无可避免?

      所谓渐进式,就是“积少成多”一步一个脚印。他们主张从L1、L2的辅助驾驶开始做起,逐步实现L5级别的完全自动驾驶。而跨越式则更加“天才”,他们主张跳过前期的辅助驾驶阶段,直接实现L4、L5级别的自动驾驶。
  • 邦达亚洲:英国脱欧进展顺利 英镑受益持续上行

      从销售地域来看,2月,乘用车国内销量101.8万辆,环比下降41.7%,同比下降26.3%;乘用车出口31.5万辆,环比下降14.7%,同比增长16.2%。由此可见,同比两位数的出口增幅一定程度上对冲了乘用车市场的整体降幅。
  • 新能源重磅利好!外资突然唱多宁德时代 黄仁勋、奥特曼:AI的尽头是光伏和储能

      2月29日,有媒体记者来到浙江杭州的一家丝芙兰门店,发现贝玲妃的专柜和修眉吧还在,仍有消费者在试用眉笔、腮红。热门的蒲公英腮红盘因为之前已经停产,柜员表示要买的话,现在还可以调货。
  • 2014年11月全球官方黄金储备

      接到居家上课通知后,昌平区流村小学的校领导和部分老师凌晨就来到学校值守,安排工作。“老师们第一时间通知家长居家学习的事,然后所有任课教师进行线上备课,准备好电子教材。因为现在很多教学是电子化的,所以不会出现措手不及的情况。”昌平区流村小学德育主任郭静娟介绍。
  • 口碑见证品牌力量!2023家居消费者口碑榜上榜品牌揭晓

      金价节节攀升,银行也看准时机,在已有的黄金积存业务基础上推出各类活动吸引客户。
  • 2024年世界女排联赛总决赛落户泰国曼谷 8队争冠

      首先是药企自建临床试验产能越来越常见,取代了一部分CRO的业务。比如2月6日阿斯利康宣布,将在美国马里兰州罗克维尔(Rockville)投资3亿美元建立工厂,生产用于关键临床试验和商业供应的细胞疗法产品。
  • 全球市场今夜又要大跌!?可能还有不止一个坏消息……

      3月12日早间,小米集团创始人、董事长兼CEO雷军发布微博官宣,小米SU7将在3月28日正式发布。小米汽车也在官方微博发文称,上市即交付,交付即上量。
  • 给个痛快话:刷牙到底要不要沾水?

      同期,MistralAI先后推出号称当时“最强的70亿参数开源模型”Mistral7B、首个开源MoE大模型Mistral8x7B。其中,Mistral8x7B更是以一条简单粗暴的磁力链接引领了大模型发布的新范式,给业界带来震撼。
  • 彭帅遭禁赛三个月和一万罚款 原因竟是劝搭档退赛

      纵观世界经济历史,金融强国无一不是以强大的经济基础为根基。英国的金融强国建立在工业革命及其形成的世界工厂的基础之上。英国的全球制造业中心地位和世界贸易大国是其金融强国的坚实基础。第二次世界大战之后,美国则依靠其工业大国和贸易大国以及科技强国的支撑,成为并延续了80年的全球金融强国地位。在强大的经济实力、科技实力和综合国力的基础之上,金融强国可以有效获得、吸纳、集聚和掌控全球金融资源,反过来也可有力地支持经济发展。
  • 教育部划定教师职业十准则:教师师德失范将一票否决

      站在搜狐大厦的3层,可以看到车水马龙的清华科技园,袁进辉指着不远处的华联大厦说:“当初跟着宿华就在那里创业。”
  • 游戏直播扎堆上市 盈利需破“三重门”

      专业照护区设有大屏实时监测入住长者的身体状况,以便出现情况及时响应。
  • 好的夫妻关系,是不把丈夫当男人

      银河证券研报指出,2024年卫星化学业绩增量或主要来自以下两方面,一是行业景气有望稳中向好,尤其是C产业链;二是在建项目投产放量有望贡献业绩增量。此外,公司依托产业链优势,开展乙烯及丙烯酸下游高端产品开发,与SKGC公司合资建设、运营4万吨/年(一期)和5万吨/年(二期EAA装置项目)。目前一期项目顺利开工,预计2025年投产。国内EAA高度依赖进口,随着EAA项目投产,公司有望享受国产替代红利。
  • 2018新浪教育盛典候选机构:巴巴姆国际少儿英语

      2023年11月29日,拼多多盘中涨超3%,市值超越阿里巴巴,成为美股市值最大中概股。旗下Temu自2022年9月在美国上线就迅速成为最受欢迎的app。一个时代会有一个时代的英雄。中国电商新王已经诞生。