糖心logo官网✅_第一次玩老妇真实经历-艺文笔记

王金豹 2026年01月22日 02:16:14
发布于:曼谷

糖心logo官网✅_第一次玩老妇真实经历_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

B. Aircraft Maintenance Configuration  (1)  Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)  Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 4. Procedure _________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  (Ref. Fig. 501/TASK 28-24-00-991-002)  **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)  **ON A/C ALL

 Subtask 28-24-00-865-063  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09  49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25  1EFF : ALL 1 28-24-00Page 505 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-710-053

 B. Test of the Valve 12QM valve  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 2 SUPPLY and  circuit breaker 3QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL pushbutton  - the FUEL system page shows  switch (P/BSW).  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 2 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 3QG.  6. On the panel 49VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 1 SUPPLY and  circuit breaker 1QG.  CONTROL are isolated.  On the ECAM lower DU:  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  7. On the panel 115VU:  On the ECAM lower DU:

 1EFF : ALL 1 28-24-00Page 506 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT ------------------------------------------------------------------------------- - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  8. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  9. On the panel 49VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 1 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 1QG.  Subtask 28-24-00-710-054  C. Test of the Valve 13QM

 -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 2 LP valve MOTOR 2 SUPPLY and  circuit breaker 4QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL P/BSW.  - the FUEL system page shows  - the RIGHT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:

 1EFF : ALL 1 28-24-00Page 507 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4

原标题:
12 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 英镑宛如行走在“刀尖”上 一失足恐“大失血”

      其实当我们回归2023年秀场,红色裤袜在各大时尚品牌中扮演着重要角色。被LYST评选为年度品牌的MiuMiu,在2023秋冬系列中透明袜,搭配深洋红色开衫和配套内衣;同一季的Gucci,则将充满活力、性感的红色裤袜叠搭在低腰透明半裙之下。MiuMiu2023FWGucci2023FW
  • 詹姆斯仅18分湖人惨败 步行者7人上双血虐

      150天的时间里,袁进辉经历了从1亿美元估值的创业公司,转到10亿美元的独角兽,再到近千亿美元的上市大公司(当前美团市值约为700亿美元),这种奇幻漂流在AI创业史上很少见。
  • 大力推进颠覆性技术创新(创新谈)

      今年的政府工作报告明确提出,“增强资本市场内在稳定性”。3月6日,证监会主席吴清在十四届全国人大二次会议经济主题记者会上阐述了“两强两严”的监管新理念。其中,“强”就是要强本强基。吴清表示,投资者是市场之本,上市公司是市场之基,投资者和上市公司都是资本市场发展的源头活水。必须真诚善待投资者,更好服务投资者,从法律上、制度上、监管执法和司法上进一步加强对投资者的保护,增强投资者对市场的信心和信任,吸引更多的投资者特别是中长期资金参与市场。
  • 蔡崇信公益基金会致敬10位“以体树人”校长

      委托人(单位)股东账号:
  • 西安楼观:看社火逛大集,欢欢喜喜过大年

      党的二十大报告指出,高质量发展是全面建设社会主义现代化国家的首要任务。习近平总书记在学习贯彻党的二十大精神研讨班开班式上再次强调,全面深化改革开放,推动高质量发展,进一步引导经营主体强信心、稳定社会预期,努力实现经济运行整体好转。发展是解决一切问题的关键,高质量发展是以创新为第一动力、协调为内生特点、绿色为普遍形态、开放为必由之路、共享为根本目的的发展,能够充分满足中国式现代化所强调的全体人民共同富裕、人与自然和谐共生、物质文明与精神文明相协调等要求,是走好中国式现代化道路的关键所在。
  • 1995还是1999?这是“英伟达们”的关键问题

      在黄女士看来,黄金积存业务提供了双向选择。如按照黄金还将持续上涨预期看,这类银行积存金一方面可以放在账户内享受投资收益,另一方面也可以在合适的时机取出“打金饰”。“现在从银行买黄金,自己打金饰也很流行,因为性价比更高。”她说。
  • 田洪良:主要货币短线操作指南

      据ElectronicTimes报道,苹果第二代VisionPro将有多达四款机型,其中两款已经确认:一款是VisonPro2,将继续瞄准高端市场;第二种型号将是更实惠的版本。苹果的目标是将在2024年初推出VisionPro的“物料清单”(BOM)成本降低50%。
  • 3月6日操盘必读:影响股市利好或利空消息

      费德里吉也是苹果公司的大人物之一,他在苹果公司活动上的露面有时会成为表情包。继直言不讳的乔布斯和冷静的库克之后,董事会可能会更愿意挑选一个活泼的人。
  • A股未来正进入震荡筑底阶段

      他们虽然不愁创业资金,但更在乎创业的结果,因为他们起点更高,背负的期望更大,必须要干出一番事业才算是有所交代。
  • 道宣大师:南山律祖(图)

      另外,2024款理想L系列车型也同步上市,新车在原有车型的基础上将续航、舒适性、安全性等多个方面的优势又推进了一步。
  • 上海唱响奋勇争先“好声音”

      综合多方面的内外部因素,涂料行业不能再用“老配方”应对新行情。面对这样的市场变化,既要开启创新之路寻找新的生存点又要基于环保政策向着诗意、绿色栖居地前进,那么,涂料行业将会共同绘制出一张怎样的新生态蓝图呢。在此背景下,5月27日下午,新浪家居与中国建筑装饰装修材料协会建筑涂料分会联合举办的行业论坛线上沙龙圆满成功。以“创新蓝涂筑牢诗意栖居”为主题,围绕“全新调整”、“创新蓝涂”、“刷新业态”三大议题,探讨建筑涂料行业的“三新”破局之路,共话行业未来“新业态”。
  • 不磨蹭的孩子,你应该带他去看看医生!儿童心理专家一句话揭露真相!

      江苏队:马建豪6分6篮板,崔晓龙16分5助攻,蒋浩然14分,刘泽希12分4篮板,吴羽佳5分5篮板。