糖心logo官网✅_大雷漏头-艺文笔记

王金豹 2026年01月26日 00:44:58
发布于:曼谷

糖心logo官网✅_大雷漏头_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

R 1EFF : 159-199, 211-212, 1 27-54-55Page 451 1 1 Aug 01/05 1 1 1CES 1

R  (k) If necessary, drill a 2.5 mm (0.10 in.) hole for the cotter pin  R  (37) in an applicable position on the bearing housing (34).  R  Remove all unwanted material from the area.  R  (l) Safety the ring nut (40) with a new cotter-pin (37).  R  (m) Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces  R  of the lever (28).  R  (n) Turn the lever (28) through 90 deg. and install it in the bearing  R  housing (34).  R  (o) Install the bearing housing (26), the bolt (25) and the nut (44).  R  (p) Apply COMMON GREASE (Material No. 04-022) to the retention plate  R  (35) and to the bolt (27).  R  (q) Install the retention plate (35), the bolt (27) and the nut (39).  R  (r) TORQUE the nut (39) to between 1.4 and 1.5 m.daN (10.32 and 11.06  R  lbf.ft).  R  (s) Manually operate the lever (28) and make sure that it moves  R  freely.  R  (t) Safety the nut (39) with the new cotter pin (38).  R  (u) Remove the adjustable strut.  R  (2) At the track 1 position:  R  (Ref. Fig. 401B/TASK 27-54-55-991-001-C)  R  (a) Connect the lever (10) to the flap link arm (5) as follows:  R  1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (6)_  R  and the nut (8).  R  (b) Install the bolt (6), the washer (7) and the nut (8).  R  (3) At the track 2 position:  R  (a) Connect the lever (28) to the flap link arm (32) as follows:  R  1 Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (33)_  R  and to the nut (31).  R  2 Install the bolt (33), the washer (29) and the nut (31)._ 

R 1EFF : 159-199, 211-212, 1 27-54-55Page 452 1 1 Aug 01/05 1 1 1CES 1

R  (4) Do a check of the flap rigged position (Ref. TASK 27-51-00-820-003).  R  (5) At the track 1 position:  R R  (a) TORQUE the nut (8) to between 7.6 and 8.5 m.daN (56.04 and 62.68 lbf.ft) and safety with a new cotter pin (9).  R  (6) At the track 2 position:  R R  (a) TORQUE the nut (31) to between 7.6 and 8.5 m.daN (56.04 and 62.68 lbf.ft) and safety with a new cotter-pin (30).  R  (7) At tracks 1 and 2:  R R  (a) Apply STORAGE PRESERVATION (Material No. 15-007) to the bolts (6) and (33) and the nuts (8) and (31) after assembly.  R R  (8) Install the Flap Track 2 Actuator 6211CM(6261CM) (Ref. TASK 27-54-49-400-002).  R R R  (9) Remove the locking tools LOCK-TORQUE SHAFT (FLAPS AND SLATS) WITH CLAMP-PIVOT from the torque shaft outboard of the track 2 actuator (Ref. TASK 27-50-00-000-003).  R  (10) Remove the hoisting sling (Ref. TASK 27-50-00-000-002).  **ON A/C 301-399,  Subtask 27-54-55-420-053-B  B. Installation of the Flap-Actuator Lever Assembly - Track 1  WARNING : USE SOLVENTS/CLEANING AGENTS, SEALANTS AND OTHER SPECIAL_______ MATERIALS ONLY WITH A GOOD SUPPLY OF AIR. OBEY THE MANUFACTURERS INSTRUCTIONS. PUT ON PROTECTIVE CLOTHING. DO NOT GET THEM IN YOUR MOUTH. DO NOT SMOKE. DO NOT BREATHE THE GAS. THESE MATERIALS ARE POISONOUS, FLAMMABLE AND SKIN IRRITANT. GET MEDICAL HELP IF YOUR SKIN OR EYES BECOME IRRITATED. 

R 1EFF : 159-199, 211-212, 301-399, 1 27-54-55Page 453 1 1 Aug 01/05 1 1 1CES 1

 (1)  At the track 1 position: R (Ref. Fig. 401C/TASK 27-54-55-991-001-B)

 (a)  Apply COMMON GREASE (Material No. 04-022) to the bearing surfaces of the actuator lever (11).

 (b)  Install the actuator lever (11) into the No.1 flap track beam.

 (c)  Apply COMMON GREASE (Material No. 04-022)to the bearing surfaces of the bearing housing (1).

 (d)  Put the bearing housing (1) in position on the flap track beam.

 (e)  Put the two washers (4) on the two bolts (5). Install the two bolts (5), the two washers (13) and the two nuts (12).

 (f)  Put the five washers (2) on the five bolts (3). Install the five bolts (3), the five washers (15) and the five nuts (14).

 (g)  TORQUE the two nuts (12) to between 2.2 and 2.6 m.daN (16.22 and

 19.17 lbf.ft).  (h)  TORQUE the five nuts (14) to between 1.3 and 1.4 m.daN (115.04 and 123.89 lbf.in).

 (i)  Remove the adjustable strut.

 (j)  Apply SPECIAL MATERIALS (Material No. 05-002) to the bolt (7) and the nut (9).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FLIGHT CONTROLS 飞行操纵6

原标题:
47 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 东风集团股份:控股股东东风汽车增持公司约2500万股H股

      ▲图源:《马斯克传》,施特劳贝尔带着时任加州州长施瓦辛格试驾Roadster
  • 抽脂就能拥有张天爱同款大长腿?这6大危害要注意

      搜狐家居总经理、产业发展战略及媒体评审团成员郑海云在会上深入解读政策,他认为国家最近下发的众多政策文件,给了家居行业很强劲的信心!后续各级政府都会陆续贯彻落实各项政策,这就意味着下半年家居行业将出现更大的发展契机!作为家居主流媒体,我们会践行自身的责任,把优秀的家居企业和产品信息传递给广大消费者,与企业一起推动家居行业高质量发展!
  • 技术面释放信号!今夜美元空头或挑战97关口、黄金多头机会来了

      《中国经营报》记者注意到,从2014年《政府工作报告》首次提及“跨境电子商务”一词,到2024年,跨境电商第十一次被写进政府工作报告,从最初的跨境电子商务试点持续扩容,经过多年布局发展,跨境电商试验区已基本覆盖全国,成为拉动外贸的新动能。国家创新与发展战略研究会学术委员会常务副主席黄奇帆认为,在新质生产力的战略推动下,制造、服务、新业态都将是未来巨大的增长极。
  • 湖人终于要完成交易了! 大过年的快来看啊

      8月2日,2023中国家居产业发展峰会暨2023大雁奖隆重启动,并为产业发展战略及行业评审专家,和产业发展战略及媒体评审团颁发聘书。
  • 2024年3月12日涨停板早知道:七大利好有望发酵

      经过两年的技术培育,2014年的AI已经成为全球技术的风向标,有头有脸的企业都开始抢先布局。
  • 城外诚刘洋:用新媒体等手段为自身赋能

      第一阶段,家长没收手机,孩子向家长示威,不吃不玩地“摆烂”几天。
  • 詹姆斯仅18分湖人惨败 步行者7人上双血虐

      一个人不想多话,保持沉默,对你爱答不理,甚至在你身边路过,眼里都根本看不见你,你们的感情对他来说,只不过是无所谓的东西。
  • 《生化危机4:重制版》VR 模式将于 12 月 8 日登陆 PSVR2 头显

      两个互相珍惜的人在一起,哪怕无话,也岁月静好;
  • 两融余额逼近1.5万亿!A股新变化!

      在科技配置上,领克07EM-P将会搭载15.4英寸偏爱灵动屏,该屏幕可以实现±15°角的自由调节,从而满足驾驶者和副驾驶的需求。与此同时,该屏幕也将承载更多功能,包括在线功能、手机互联、语音交互等,从而提升科技感和便捷度。
  • 厨房空调该怎么选?

      我国科学家率先发现人类胚胎激活机制为优生优育打下基础
  • 须理性看待国家海外净资产及其净收益

      责任编辑:张文文章关键词:相关专题:VIP课程推荐加载中...APP专享直播1/10热门推荐收起新浪财经公众号
  • 2022年全国工商联家具装饰业商会标准化工作会议

      近日,东部战区海军航空兵某机场战机列阵、引擎轰鸣。“起飞!”随着指挥员一声令下,多型战机接续升空,一场多课目、多批次跨昼夜飞行训练拉开帷幕。(来源:东部战区)
  • 北汽蓝谷能否借势华为打一场“翻身仗”?

      具体来说,我建议,平台审核方面首先要加强对自媒体信息发布的审核,最好进行分类分层的专业化审核。二是要畅通投诉渠道、建立投诉机制,让大众在发现不实信息时能第一时间投诉、督促纠正,使一些错误、不良信息的传播得到及时遏制。三是要加大对自媒体不良信息传播造成的后果的处罚力度,提高违规违纪成本。
  • 中信银行涉56项违规收2.25亿罚单 不良率1.22%损失类贷款新增122亿

      这一轮黄金价格暴涨,最核心的推动因素还是市场对美联储的降息预期。在经历了前两年史诗级的加息周期之后,美联储最后一次加息的脚步停止在2023年7月。随着美国通胀从高点回落,市场普遍认为美联储的加息周期已经结束,很快就会转向降息。《金手指》剧照
  • 《至少一个小时》独家对话冷友斌文字实录

      《三体立体书红岸基地》是《三体》立体书“收藏家”系列01,主要以叶文洁为第一视角,讲述她在红岸基地的人生经历。这是一部红岸基地的全景立体图鉴,也是一篇叶文洁跌宕起伏的人物传记,更是一场科幻与立体艺术的极致碰撞。在发布会现场,乐乐趣准备了立体书中等比二倍放大的红岸基地纸艺模型,带来震撼视觉效果。