糖心logo官网✅_v3 man-艺文笔记

王金豹 2026年01月21日 22:57:51
发布于:曼谷

糖心logo官网✅_v3 man_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 B. Do the test given in Para. 3.  5. Close-up________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 1 (2CE1) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 239  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Blue Hydraulic Pressure Transducer Signal for the ELAC 2  1. Possible Causes _______________  - ELAC-2 (2CE2)

 - wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning)

R AMM 29-10-00-863-003 Pressurize the Blue Hydraulic System with a Ground R Power Supply AMM 29-10-00-864-003 Depressurize the Blue Hydraulic System ASM 27-92/28  3. Fault Confirmation __________________  A. Job Set-Up  (1) Pressurize the Blue hydraulic system with the electric pump (Ref. AMM TASK 29-10-00-863-003).  B. Test  (1) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).  4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC2 OR WIRING FROM B HYD PRESS XMTR 2065GN

 - replace the ELAC-2 (2CE2), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - do a check and repair the wiring of the ANI 4-3 signal from the ELAC 2 (2CE2) COM and MON parts to the first terminal block, (Ref. ASM 27-92/28).  B. Do the test given in Para. 3.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-93-00∞∞∞∞∞∞∞∞∞∞Page 241  May 01/00 CES

 5. Close-up ________  A. Depressurize the Blue hydraulic system (Ref. AMM TASK 29-10-00-864-003).

 Loss of the Green Hydraulic Pressure Switch Signal for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - wiring of the LOW GREEN PRESS signal from the ELAC 1 (2CE1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  ------------------------------------------------------------------------------- REFERENCE  DESIGNATION   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 3

原标题:
63 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • BBH:联邦基金期货修正对加息的预期

      事发时,现场很多人报警。
  • 挑选小儿退热药,宝妈们各有绝招

      再结合旗下自主新能源品牌的表现,无一不透露出长安汽车在新能源时代的焦虑。
  • 房价暴涨时应严厉打击囤地炒地

      《第5次全国未成年人互联网使用情况调查报告》显示,约四分之一的家长认为自己对互联网存在依赖心理,家长网络素养的提升也需要得到重视。
  • 食人肉的寄生虫正在美国蔓延,气候变化可能加剧这个噩梦

      国家高级食品检验师、食品工程中级工程师王思露表示,从大环境来看,金龙鱼所售主要产品的价格会随原材料的价格而改变,而大豆、大豆油及棕榈油等原材料价格的下跌有所回落,在销量增速无法追上价格下落的速度后,营收会出现下滑。对金龙鱼而言,是大公司,而且产业贴合民生,所售产品皆为消费者生活必需品,它的涨价空间不大,所以销售单品的利润自然不会太高,这也许对品牌和企业是一种挑战;加之人口基数并无较大增加,需求量肯定不容乐观,再匹配上同行业的竞争,其实这种双降情况也算合理。
  • 老艾侃股:外部冲突会终结A股牛市吗?

      在活力生活区一楼大厅中,明亮的落地窗边是一片郁郁葱葱的绿植和一些悬挂着的鸟笼,活泼可爱的小鸟跃然其间,为社区生活增添了不少自然风趣。作为一处休闲区,长者可以在这里会客、休息、娱乐,十分惬意。
  • 意甲女排斯坎迪奇0

      2022年3月成立后的一年内,合肥市高质量引导基金招引设立了47只母子基金,与社会资本合作设立参股基金超1500亿元;累计推介招商项目105个,计划总投资813亿元,完成项目与资本有效对接不低于300次。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你海量资讯、精准解读,尽在新浪财经APP
  • 一场针对高学历年轻人的定制骗术

      3月5日,十四届全国人大二次会议在人民大会堂开幕,国务院总理李强在政府工作报告中再一次提及“跨境电商”。
  • 三分四步法 中信银行建议你“做自己人生的CFO”

      对当下中国而言,如何以“先手棋”赢得主动权,如何开辟新领域新赛道,根本要靠科技创新。贯穿新质生产力和新兴领域战略能力的底层逻辑,也依然是科技创新。
  • 俄官员:IS等组织组建黑客部队 世界面临威胁

      这几年,我深入到不同地区、学校去做一线调研,并基于国家教育治理体系、制度的情况,提出了有关规范校外培训、修改未成年人保护法、课程方案修订等方面的建议。由于这些建议有着比较强的可操作性,很多建议得到了相关部门的重视和吸纳。这个过程中我也感受到,关乎孩子的事,全社会和相关部门都特别重视。
  • 极石汽车回应“1 月销量为 0”:系不实信息,累计产量 2586 辆 / 销量 2357 辆

      第二阶段,孩子开始找各种借口使用手机,比如打卡、交作业。家长不可能随时盯着,慢慢地,使用时间越来越长,从打卡变成聊天,进而玩游戏。
  • 任泽平:中美实力全方位对比

      Choice数据显示,今日宁德时代北向资金净买入额居沪深十大成交股之首,达16.2亿元。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你新浪声明:此消息系转载自新浪合作媒体,新浪网登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述。文章内容仅供参考,不构成投资建议。投资者据此操作,风险自担。海量资讯、精准解读,尽在新浪财经APP
  • 金价上涨带火黄金积存业务 部分银行调整门槛

      天下黄河富宁夏。如今,不仅是黄灌区,曾经贫瘠干旱的西海固,也早已换了人间。1997年,习近平来到宁夏,对口帮扶宁夏脱贫攻坚的一个重要思路就是做水的文章。通过抓井窖工程,解决居民用水;通过生态移民搬迁,恢复植被,涵养水土。在习近平总书记的关怀和引领之下,西海固地区做活了水的文章,初步解决了生活用水、产业用水的问题,并逐步实现开发用水和生态蓄水的良性循环,走上脱贫奔小康的致富之路。点击进入专题:
  • 问题探花秀2年合同签鹈鹕!内线四大天王凑齐了

      虽然标题看来是从过去的真实世界和圣休亚瑞寻找灵感,但即将推出的系列作会为暗黑破坏神系列带来新的发展。身处辽阔绚烂的新景色中,你将遇上暗黑破坏神公式的全新元素,让你能更进一步控制游戏走向,同时也需面对前所未见的黑暗。做好防御准备。我们将返回圣休亚瑞。