糖心logo官网✅_亚洲三区精品-艺文笔记

王金豹 2026年01月26日 12:28:34
发布于:曼谷

糖心logo官网✅_亚洲三区精品_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION  ------------------------------------------------------------------------------- AMM 22-66-34-000-002 Removal of the FAC (1CC1,1CC2)  AMM 22-66-34-400-002 Installation of the FAC (1CC1,1CC2)  AMM 22-96-00-710-001 Operational Test of the AFS  AMM 27-22-51-000-001 Removal of the Rudder Trim Actuator (10CC)  AMM 27-22-51-400-001 Installation of the Rudder Trim Actuator (10CC)  AMM 27-23-51-000-001 Removal of the Rudder Travel Limitation Unit 4CC

R  AMM 27-23-51-400-001 Installation of the Rudder Travel-Limitation Unit 4CC ASM 22-67/01  3. Fault Confirmation __________________  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION ------------------------------------------------------------------------------- 121VU AUTO FLT/FAC2/28VDC  5CC2 M19  B. Test  (1) Do the operational test of the AFS (Ref. AMM TASK 22-96-00-710-001) and read the result for the FAC 2.  (a) If the circuit breaker 5CC2 is open refer to Para. 4.B.

 4. Fault Isolation _______________

 A. If the circuit breaker 5CC2 is closed, and if the test gives the maintenance message AFS: FAC2:  - do a check for 28VDC at the FAC 2 (1CC2).  (1) If there is 28VDC:

 - replace the FAC-2 (1CC2), (Ref. AMM TASK 22-66-34-000-002) and (Ref. AMM TASK 22-66-34-400-002).

 (2) If there is no 28VDC:

 - do a check of the wiring of the 28VDC signal from the circuit  breaker (5CC2) to the FAC 2 (1CC2). R - do a check of the wiring of the ground signal at the FAC 2 (1CC2) R pin AC/3.  (Ref. ASM 22-67/01).  (a) If there is no continuity:

 - repair the above wirings.

 (b) If there is continuity:

 - replace the C/B-AUTO FLT/FAC 2/28VDC (5CC2).  B. If the circuit breaker 5CC2 is open:  - close this circuit breaker.  (1) If this circuit breaker opens again:  - disconnect these three units:  LIMITATION UNIT-RUDDER TRAVEL (4CC)  ACTUATOR-RUDDER TRIM (10CC)  FAC-2 (1CC2)

 - close the circuit breaker 5CC2.

 (a) If this circuit breaker stays closed:

 - connect the units one by one until the circuit breaker 5CC2 opens again

 - replace the related unit: for LRU 4CC: (Ref. AMM TASK 27-23-51-000-001) and (Ref. AMM TASK 27-23-51-400-001) for LRU 10CC: (Ref. AMM TASK 27-22-51-000-001) and (Ref. AMM TASK 27-22-51-400-001) for LRU 1CC2: (Ref. AMM TASK 22-66-34-000-002) and (Ref. AMM TASK 22-66-34-400-002).

 (b) If this circuit breaker opens again:

 - do a check for a short to ground between the circuit breaker 5CC2 and the three units, (Ref. ASM 22-67/01).  1 If there is a short to ground: _ - repair the related wiring.  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞22-66-00∞∞∞∞∞∞∞∞∞∞Page 205  Feb 01/05 CES

_  - replace the C/B-AUTO FLT/FAC 2/28VDC (5CC2).  (2) Connect all the units.  C. Do the test given in Para. 3.

 Loss of the FAC 1 GENERAL Bus  1. Possible Causes _______________  - FAC-1 (1CC1)

 - wiring of the FAC OWN (GENERAL BUS) from the FAC 1 (1CC1) to the first terminal block

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 22-66-34-000-002 Removal of the FAC (1CC1,1CC2)  AMM 22-66-34-400-002 Installation of the FAC (1CC1,1CC2)  AMM 22-96-00-710-001 Operational Test of the AFS  ASM 22-69/01

 3. Fault Confirmation

__________________  A. Test  (1) Do the operational test of the AFS (Ref. AMM TASK 22-96-00-710-001) and read the result for the FAC 1.  4. Fault Isolation _______________  A. If the test gives the maintenance message AFS: FAC1/C-M ARINC LINK:  - replace the FAC-1 (1CC1), (Ref. AMM TASK 22-66-34-000-002) and (Ref. AMM TASK 22-66-34-400-002).  (1) If the fault continues:  - do a check and repair the wiring of the FAC OWN (GENERAL BUS) from the FAC 1 (1CC1) to the first terminal block, (Ref. ASM 22-69/01).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 AUTO FLIGHT 自动飞行2

原标题:
5 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 预计2018年GDP增速放缓至6.4%

      MoE架构立大功
  • 股海导航 2月29日沪深股市公告与交易提示

      同日,珠海市发布《珠海市支持低空经济高质量发展的若干措施(征求意见稿)》,旨在推动低空经济的发展。该意见稿拟对经审批在本地新开设并常态化运营的eVTOL载人航线给予补贴,每家企业每年度补贴总额不超过500万元。
  • 英报:C罗卷入新冠病毒恐慌 确诊传染链指向尤文

      中国建筑材料流通协会会长、产业发展战略及行业评审专家秦占学也在致辞中表示,大雁奖·中国家居产业发展峰会自2013年举办以来,作为覆盖全家居行业的专业年会,开创了产业链上下游协会、商会、品牌、媒体共同协作的新局面,得到了业内广泛认可。
  • 第二届“上海城市更新及其空间优化技术学术论坛”顺利召开

      其中最值得称道的就是内里面料的‘反转’设计,sacai直接将CarharttWIP服饰的内里面料转换到外部,一种‘未完成的美’就这样赤裸的展现在人们面前,包括这件DuckCoat的独特设计,‘大廓形披风’造型感非常强烈,另外绝不能错过的就是西装夹克了,灰与黑的经典组合,虽然没有那么惊艳,但绝对是非常百搭且能打的质感单品~
  • 王永利:2018宏观调控更需灵活性

      减肥药“双雄”均跌超2%
  • 足彩彩果:拉齐奥1

      红杉三大区域独立
  • 安妮海瑟薇 快去向俞飞鸿讨教保养秘籍

      (作者系中国市场学会理事、经济学教授)股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你海量资讯、精准解读,尽在新浪财经APP文章关键词:VIP课程推荐加载中...收起@@title@@APP专享直播1/10热门推荐收起新浪财经公众号
  • 全球主要黄金ETFs11月19日持金总量与上一交易日增加1.177吨

      在发布会的最后一个环节,主持人介绍道:“在《三体》小说里,叶文洁通过电波和三体文明取得联系。所以在《三体立体书红岸基地》中,我们特别设置了一本复古电码本,为读者营造身临其境的阅读体验。今天活动现场,我们也准备了三组电码,邀请大家一同来破译。”趣味解谜的互动方式吸引在场读者热情参与,大家切实感受到《三体》立体书“收藏家”系列是一套互动强,立体好玩的书品。
  • 孩子哭闹撒泼时,如何拒绝他的无理要求?

      责任编辑:于健SF069家居跟帖微信
  • AI“吃电”凶猛!ChatGPT每天耗电已超50万千瓦时

      教育配套:楼盘5km(直线距离)内有12个幼儿园,最近的是丰台区花城幼儿园分园,距离楼盘323米。
  • 道达投资手记:这个消息一定要重视

      后续是有两个长剧古偶待播。)
  • 大力发展债券市场意义重大

      亮色调比起出现在旁的单品中,更多是在毛衣本身的图案中表现出来。
  • 李迅雷:实施扩内需战略需要关注长期目标

      新公布的这三款amiibo每一款的售价都是4290日元(约212元人民币),三款套装售价16990日元(约838元人民币)。
  • 让市场教育散户并奠定慢牛基础

      杨紫画了一幅两人“永远好朋友”的简笔画,并配文:“礼不在大小,而在心意。这幅画把我所有的祝福都画在了里面,具体的你自己慢慢体会……最后祝你永葆青春!皱纹法令纹永远消除!”张一山一点也不客气地回复道:“脸的大小画反了,请尊重事实。”
  • 恋爱中男生最希望女朋友做的五件事

      中铁大桥局港珠澳大桥桥梁工程项目经理谭国顺:对各个构件的精度要求越来越高,对不准偏差大,就装不上。港珠澳大桥提出来,(安装)偏差1公分的要求,这样的技术要求在世界上大型工程建设过程中,是难以想象的。港珠澳大桥的技术标准远远高于世界上任何一个国家。