深夜福利✅_村长那又黑又粗的东西-艺文笔记

王金豹 2026年01月22日 00:19:18
发布于:曼谷

深夜福利✅_村长那又黑又粗的东西_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

B. Aircraft Maintenance Configuration  (1)  Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)  Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 4. Procedure _________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  (Ref. Fig. 501/TASK 28-24-00-991-002)  **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)  **ON A/C ALL

 Subtask 28-24-00-865-063  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09  49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25  1EFF : ALL 1 28-24-00Page 505 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-710-053

 B. Test of the Valve 12QM valve  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 2 SUPPLY and  circuit breaker 3QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL pushbutton  - the FUEL system page shows  switch (P/BSW).  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 2 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 3QG.  6. On the panel 49VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 1 SUPPLY and  circuit breaker 1QG.  CONTROL are isolated.  On the ECAM lower DU:  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  7. On the panel 115VU:  On the ECAM lower DU:

 1EFF : ALL 1 28-24-00Page 506 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT ------------------------------------------------------------------------------- - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  8. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  9. On the panel 49VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 1 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 1QG.  Subtask 28-24-00-710-054  C. Test of the Valve 13QM

 -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 2 LP valve MOTOR 2 SUPPLY and  circuit breaker 4QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL P/BSW.  - the FUEL system page shows  - the RIGHT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:

 1EFF : ALL 1 28-24-00Page 507 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4

原标题:
36 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 任泽平:中国赢得了充足的时间窗口

      总的来说,勐焕大金塔确实值得一看。不为着它背后的宗教意义,即使是作为一件建筑艺术,也不虚此行。
  • 宁德时代“龙抬头”引爆锂电股 缺电焦虑拉升储能市场预期

      2016年之后,很长一段时间,鹿小策每月稿费都能过万,最高时一度达到税后4万元。网文行业赚钱速度高于其他行业,所以毕业后,鹿小策便选择了当全职作者,日更6000字,很多时候“双开”(两面开工,两本同时写)。
  • AETOS艾拓思:英镑一柱擎天 欧元命悬一线

      CDC+双腔空悬配上小轮毂,在走高速的时候兼顾舒适性与能耗,更符合家庭MPV长距离出游的用车场景。
  • 全球经济增长担忧升温 黄金获得避险买盘追捧

      生成式人工智能正在衍生出庞大的推理算力需求,但这些需求的算力供给却是基于上一代芯片架构,在这种情况下,开发者只能做编译优化调度,把最新的任务“翻译成”底层过时芯片擅长做的事儿。
  • 香港大型银行美元定存跌破5% 你会考虑“上车”吗?

      多重信号之下,比特币是否还有进一步上行空间?未来如何走?于佳宁指出,以比特币为首的数字资产可以被认为是一种“未来资产”,其价值能够有效穿越经济周期。而数字资产可以理解为数字经济发展的一面镜子,就如同股市反映实体产业的关系一样,数字资产价值重估反映数字经济的发展和繁荣。但作为一种高波动性的资产,比特币的价格短期内可能会经历剧烈波动,这在很大程度上取决于市场情绪、宏观经济环境、监管政策等因素。
  • 春节期间全球市场动荡打击风险偏好

      此外,海底捞已成立加盟事业部,制定加盟特许经营相关模式细节及商务合作流程。
  • 官宣:NRG正式签下Walco

      澳大利亚堪培拉“东北农家小院”餐馆的经营者孟繁华在做手工面条。新华社发(储晨摄)
  • USDA:3月份公布的全球豆油供需平衡表

      [文科就业难?代表支招:辅修人工智能、微专业]#人大代表谈文科生就业出路#稳就业,是今年两会最受关注的话题之一。要从哪些方面着力缓解就业矛盾?不少委员代表认为,需从根本上解决高校毕业生就业问题,还是要靠人才培养模式的改革。在如今以人工智能为代表的高科技迅猛发展的大背景下,人文学科学生该如何突围?全国人大代表、华东师范大学党委书记梅兵给文科生们支招。#SMG看全国两会##全国两会上海声音#点击进入专题:
  • 如果人民币外汇期货在境内上市

      3月4日晚间,微博@新渠道-李霸天发布微博称,上市72小时内理想MEGA的全国大定订单仅有3218辆,退定量反而有10297辆。随后几天里,李霸天的微博得到了多个行业人士的证实,车fans的孙少军也在其微博发布了足以佐证该数据的销量快报。
  • 用时间来疗伤?为什么会越疗越伤

      紧随其后的是3月8日案名揭晓的“中建·云境”,位于丰台郭公庄1518-621地块,其销售指导价为9.2万/平方米。据悉,中建东孚(中建八局)去年以75.9亿的价格竞得该地块,地块土地面积70124.928平方米,建筑控制规模≤平方米,容积率和控高同为2.5和60米。
  • 11月永安第4次加仓2万手铁矿 前3次都被打脸这次呢?

      调查委员会专员汉尼·梅加利说,叙利亚难民仍构成目前世界上最大的难民潮,超过1300万叙利亚人无法返回家园。
  • 黄金突破楔形上轨,目标见1227.30

      分析师表示,如今的效率/生产力主题(人工智能、自动化)正处于萌芽阶段,就像90年代中期的个人电脑革命一样。而到了1999年,科技股是根据价格来估值的,而今天,TMT(科技、媒体、电信)的盈利贡献和资本纪律与1995年的“漂亮50”(Nifty50,指上世纪六七十年代在纽约证券交易所交易的50只备受追捧的大盘股)相似。
  • 这个大国,重磅宣布:T+0!其股市已连涨8年

      我们还是在电脑城门口,买7元一张电影光盘的时代么?
  • 瑞士专家发明零能耗“空气凝水”,为解决全球水资源匮乏问题带来希望

      新浪金融评测室综合环境配套、设备设施、安全保障、医疗健管、文娱生活、餐饮膳食、照护服务、运营管理、ESG责任9大维度96项细分指标对国寿嘉园·天津乐境进行实地探访,最终给予五星评分(最高五星)。