国内精品♨️_233乐园安装最新版2021-艺文笔记

王金豹 2026年01月23日 01:20:40
发布于:曼谷

国内精品♨️_233乐园安装最新版2021_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 -the clearance between the wing-skin and the edges of the panels. The clearance must be not less than 0.5 mm (0.0196 in.).  Subtask 57-41-37-390-050  B. Seal Installation  (Ref. Fig. 805/TASK 57-41-37-991-017)

 NOTE : The procedure that follows can be done at the subsequent servicing ____  interval.

 NOTE : Seal only the clearance between the trailing edge of the ____  pressure-relief panels and the wing skin.

 (1)  Fully degrease the area to be filled with a MISCELLANEOUS (Material No. 19-003), made moist with CLEANING AGENTS (Material No. 11-026).

 (2)  Apply masking tape around the edges of the area to be filled.

 (3)  Use a spatula or extrusion gun to insert SEALANTS (Material No. 09-002B) or SEALANTS (Material No. 09-016) into the applicable prepared area.

 (4)  Use a non-metallic scraper to remove unwanted sealant before it cures.

 (5)  Let the sealant cure (refer to the manufacturers instructions).

R 1EFF : 106-149, 157-199, 209-299, 301-399, 1 57-41-37Page 826 1401-499, 1Aug 01/05 1 1 1CES 1

 (6)  Make sure the surface of the seal is flush with the surfaces of the applicable pressure-relief panel (9) and/or (30) and the wing skin.

 (7)  Remove the masking tape from the area around the seal.

 (8)  Remove the applicable bolts (10) and/or (28).

 (9)  Remove the applicable pressure-relief panel (9) and/or (30). Use a suction cup if necessary.

 (10)  Examine the seal to make sure that:

 - there is a full strip of sealant along the trailing edge of the panel opening

 - there are no bubbles or spaces in the sealant

 -no parts of the seal are loose.

 (11)  If the sealant does not make a full strip, or there are bubbles or spaces, or the seal is loose:

 (a)  Use a non-metallic scraper to remove the seal.

 (b)  Do again steps (1) thru (11).

 (12)  Apply talcum powder MISCELLANEOUS (Material No. 19-004) to the mating surface of the seal.

 (13)  Install the applicable pressure-relief panel (9) and/or (30) with the applicable bolts (10) and/or (28).

 **ON A/C ALL  5. Close-up ________ Subtask 57-41-37-865-058  A. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 5CV, 7CV.  Subtask 57-41-37-942-053  B. Removal of Equipment  (1)  Remove the access platform(s).

 (2)  Remove the warning notice(s).

 1EFF : ALL 1 57-41-37Page 827 1 1 Aug 01/05R 1 1 1CES 1

 (3) Remove the ground support and maintenance equipment, the special and

 standard tools and all other items.

R 1EFF : ALL 1 57-41-37Page 828 1 1 Aug 01/05 1 1 1CES 1

 TASK 57-41-37-350-002

 Repair to the Leading Edge Pressure-Relief Panel 521CB(621CB) After it has Operated  WARNING : PUT THE SAFETY DEVICES AND THE WARNING NOTICES IN POSITION BEFORE YOU _______ START A TASK ON OR NEAR:  - THE FLIGHT CONTROLS

 - THE FLIGHT CONTROL SURFACES

 - THE LANDING GEAR AND THE RELATED DOORS

 -COMPONENTS THAT MOVE.  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific circuit breaker(s) safety clip(s) No specific cutting tool No specific extrusion gun No specific lint-free cloth No specific masking tape No specific non metallic scraper No specific non-metallic scraper No specific spatula No specific suction cup No specific warning notices No specific access platform 2.5 m (8 ft. 2 in.)  1EFF : ALL 1 57-41-37Page 829 1 1 May 01/04R 1 1 1CES 1

 B. Consumable Materials

 -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- Material No. 05-064 GB ABP1-4053  RELEASE AGENT (Ref. 20-31-00)  Material No. 09-001 USA MIL-S-8802 TYPE I CLASS A  FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00)  Material No. 09-002B F ASNA 0163  FUEL TANK SEALANTPOLYSULFIDE (Ref. 20-31-00)

原标题:
30 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 易烊千玺发迟到4千万粉丝福利 劲歌热舞青春洋溢

      董苏先是利用贾辉的身份,顺利拿到了静静的微信号;随后又假冒了静静,用微信和静静的家人取得了联系。
  • 广州珠江实业集团董事长郑暑平涉嫌严重违纪违法被查

      展望未来,金价走势如何?目前业内观点仍相对乐观。(维权)首席经济学家、研究所所长高瑞东认为,短期看,美国通胀风险反复制约降息时点的开启,但高利率环境下,美国经济降温仍是主要趋势,叠加美债供给压力缓解,美债利率中枢下行是大方向,对金价形成向上支撑。
  • 稳增长措施难以扭转下行趋势

      每年春季,拜登和他的幕僚都会为制定从当年10月1日到次年9月30日的财年预算草案,但因为众议院是由共和党所把持,普遍认为拜登的预算案在国会不可能获得通过。
  • 第九届SportIN体育潮流产业大会北京盛大开幕

      (1)上市公司年度报告、半年度报告公告前30日内;
  • “银行卖金饰”,彻底火了!

      6、经济效益:本项目预计实现年平均营业收入27,021万美元,实现年平均净利润6,689万美元。根据财务分析评价结果,项目净利润率为24.76%,项目投资回收期为4.88年。
  • 美银策略师:美国高评级债券的高速发行难以持续

      ▲爱达·魔都号。图片来自:环球网
  • 两融余额逼近1.5万亿!A股新变化!

      非技术因素方面,飞行汽车未来批量化商业运营,必然带动城市人流、物流、资金流和信息流的激增,随之对着陆点、停靠地以及充电站等设施提出了综合性与及时性要求,而这些条件的满足又需要以城市规划的调整以及地面物理设施的位移与改建为基本前提,从论证到实施绝非一蹴而就;空域管理方面,飞行汽车的航线制定、路径规划、飞行分隔、冲突规避、空域等待以及空中执法和事故责任划分等,都需要根据情况制定一套新的“空中交通管理体系”。而到目前为止,全球没有任何一个国家针对飞行汽车制定清晰、统一的标准以及规章制度,无经验可循的背景下,必然拉长相关制度的落地时滞。
  • 今年高考会不会推迟?教育部回应

      夸张点说,就像卖房中介一样,恨不得晚上都在给你介绍产品,与一些品牌问某个功能都支支吾吾的表现形成鲜明对比。
  • 全国政协委员洪明基:建议不要给00后贴标签

      如今回看自己在台上的表现,何赛飞忍不住掩面不好意思,她说自己生活中就是这样直接、不装、也爱笑,而且是越老越单纯,“年轻时候我还不是这样,因为从小跟父亲在一起,老觉得不要被别人欺负,有点防着别人,心里头锁的蛮紧的,但是后来随着不断学习、在生活中接受正能量的东西,我觉得人就是要首先为别人服务,有点问题困难也没什么,我就发现我这性格好像越来越不纠结了,越来越简单了。”
  • 胜负彩23159期国内部分专业媒体复式推荐总汇

      第二排配有电动腿托,第三排最大拥有1010mm的腿部空间,座椅坐垫长517mm,不论是第二排,还是第三排,地台都做到了纯平地,让后排乘客坐姿更自然更舒服。
  • 网友反馈:iOS 15.5系统“时间与地点”服务偷跑大量流量

      时至今日,我们无法考证是不是特斯拉启发了乔布斯,但可以确认的是,作为站在时代最前沿的两个人,当时的乔布斯一定在某一瞬间和马斯克看到了一个同样的未来。
  • 美元摔倒欧洲还有一颗定时炸弹 黄金多头这下窃喜

      “来不及了!”杨雨菲冲出小姐妹家,往自己租的房子快步走去,“这么重要的事情居然忘了”。半小时后女儿就放学了,晚饭还没做,她有点自责。杨雨菲的女儿在毛坦厂中学复读,每天的晚饭时间只有下午5点5分以后的半个多小时,随后又将返校学习。
  • 2024年全国新年登高健身大会启动在即

      1、投票时间:2024年3月27日的交易时间,即9:15一9:25,9:30一11:30和13:00一15:00。
  • 林义相贺强刘纪鹏等谈A股向何处去:监管错位(全文)

      在笔者看来,这对上市公司来说是重要启发和行动指南。