深夜福利✅_色色网站-艺文笔记

王金豹 2026年01月26日 16:09:20
发布于:曼谷

深夜福利✅_色色网站_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific blanking caps  No specific blanking plugs  No specific circuit breaker(s) safety clip(s)  No specific platform 3.5 m (11 ft. 6 in.)

 B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action  52-41-00-010-001 Open the APU Doors for Access  49-51-13-991-001 Fig. 401

 3. Job Set-up __________ Subtask 49-51-13-860-050  A. Aircraft Maintenance Configuration  (1)  Energize the ground service network (Ref. TASK 24-41-00-861-002).

 (2)  On the panel 25VU, make sure that the APU MASTER SW pushbutton switch is OFF.

 (3)  Put the warning notices on panel 25VU to tell persons not to start the APU.

 (4)  Make sure that hydraulic systems are depressurized  (Ref. TASK 29-00-00-864-001).

 Subtask 49-51-13-865-050  B. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU APU/APU/CTL 2KD L42 121VU APU/ECB/SPLY 1KD L41  Subtask 49-51-13-010-050  C. Get Access  (1)  Put the platform below the APU access doors.

 (2)  Open the APU access doors 315AL, 316AR and safety them in the open position (Ref. TASK 52-41-00-010-001).

 (3)  Set the LIGHT control switch 11LJ to the on position.

 4. Procedure _________  (Ref. Fig. 401/TASK 49-51-13-991-001) Subtask 49-51-13-020-050  A. Removal of the Pneumatic Sensor Assy  (1)  Disconnection of the electrical connectors (15) and (17).

 (a)  Disconnect the electrical connectors (15) and (17) from the total pressure transducer and differential pressure transducer.

 (b)  Put blanking caps on the disconnected electrical connectors.

 (2)  Disconnect the tube (13) from the static sensor assy (11).

 (a)  Remove and discard the lockwire from the bolt (3).

 (b)  Remove the bolt (3), the washer (2) and the retainer (1) from the static sensor assy (11).

 (c)  Move the hose (13) away from the static sensor assy (11).

 (d)  Remove and discard the packing (12).

 (e)  Put blanking plugs on the disconnected hose end.

 (3)  Disconnect the pneumatic sensor assy (14) from the bleed duct

 (a)  Remove the bolt (4) from the bracket assy (9).

 (b)  Remove the bolts (6) NOTE : After the removel of the bolts (6) the flow sensor (7) is

____ only kept in position through the tubes (5) and (8).

 (c)  Remove the bolt (10) connecting the bracket assy (9) to the bleed duct.

 NOTE : Prevent a uncontrolled movement of the pneumatic sensor ____ assy (14) after the removal of the bolt (10).  (4)  Remove the pneumatic sensor assy (14).

 (5)  Remove and discard the gasket (16).

 Pneumatic Sensor Assy Figure 401/TASK 49-51-13-991-001  R  EFF :  001-003, 051-099, 401-499,  49-51-13 Page 404 Aug 01/05  CES 

 TASK 49-51-13-400-001  Installation of the Pneumatic Sensor Assy (GTCP 36-300)

 1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific  Torque Wrench : range 0.00 to 1.20 m.daN  (0.00 to 9.00 lbf.ft)  B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM 机载辅助动力 AIRBORNE AUXILIARY POWER5

原标题:
40 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 外资大行研判:逢低布局A股正是良机

      放弃造车的苹果,可以更好地拥抱AI,这是资本市场期望,也是库克的希望。因为一直以来,库克一直做的事情,都是为苹果的股价服务。
  • 刚刚,楼市传来大消息!中国移动又爆发,冲击A股第一!巨头有救了?500亿瑞郎驰援!

      强大的金融机构是金融强国实际功能的主要构成部分。金融强国通常拥有规模和质量处于全球前列的商业银行、投资银行、保险公司和信托公司的金融机构体系。第二次世界大战以来,美国的商业银行和投资银行长期处在全球的前列,日本的商业银行一度赶上后又掉队。直到今天,美欧日的金融机构依然处在全球重要地位,尤其是美国的金融机构总体上仍处在强势状态。经过加入世界贸易组织后大刀阔斧的改革,中国的银行业迅速崛起,截至2022年末,资产规模合计约45.9万亿美元,为美国银行业的1.95倍。但就总资产而言,中国金融体系大致相当于美国的70%左右。中国的银行业虽大,但在全球的影响力相对有限,因其业务国际化程度偏低,产品和服务的国际竞争力较弱。相比美国十分发达的资本市场和证券业,我国的证券业和投资银行发展相对滞后。据统计,美国拥有世界上规模最大的资本市场,股市总市值超过46万亿美元,占全球股市总市值的42.5%。而中国股市总市值仅占10.6%,为美国的1/4左右,且发展步线较慢。保险业和信托业发展状况与国际先进水平相比亦有不小的差距。可见,中国的金融机构除银行业外,既不大,也不强,离金融强国所需要的强大金融机构体系要求尚有不小的差距。未来,需按照市场化、法治化、国际化原则,健全具有高度适应性、竞争力、普惠型的现代金融机构体系。
  • 中国人口大流动:3000个县全景呈现

      极氪方面表示,该行为非极氪官方行为,亦非极氪授意行为,该账号以冒用极氪品牌的方式实施的违法侵权行为,对极氪品牌造成严重损害,极氪保留采取一切必要法律行动追究侵权者法律责任的权利。
  • 中兴通讯股份有限公司关于2023年度计提信用减值及资产减值准备的公告

      SteamVR作为一个典型的PCVR平台,里面仅统计基于有线/无线串流平台的设备数据,从数据中可以看到,VR一体机的数量目前已经高于50%,超越了原生PCVR用户群体。
  • 如何应对中美贸易摩擦升级

      而如果不退役,s1mple也不太可能再去其它队伍了。鉴于s1mple的性格和雄心壮志,他不太可能会自我降级。虽然事实上从NaVi到Falcons已经是一种半降级了...但s1mple不会接受自己的ID出现在二三线队伍阵容当中。
  • 对话大亚圣象马龙:一块饰面板,一幅新篇章

      项目总投资39.8亿元,预计5.9年内收回
  • 黑色系回落明显 原油反弹无力黄金稳步上涨

      该工作人员表示,开售当日上午10点,该行约120万元的国债额度就一“抢”而空。
  • 如果人民币外汇期货在境内上市

      4、2019年股票期权激励计划预留授予等待期内,原激励对象中有35名激励对象因个人原因离职,不再具备激励资格。公司董事会经公司2019年第一次临时股东大会的授权,根据《上市公司股权激励管理办法》、公司《2019年股票期权激励计划(草案)》及相关规定,注销了上述离职人员已获授但尚未行权的股票期权。
  • 放松限贷无法扭转楼市下滑趋势

      现在的女生就算再怎么喜欢这个男的也很难鼓起勇气去表白,第一,历来一个男追女天经地义的意识,第二,女生追男会被认为女生不矜持,所以不被看好,但是现在的女生的想法越来越前卫,表白男生已经不再是难以启齿的事情了。女生表白
  • 升级美学家居解决方案,美克美家×融舍新品牌发布携手演绎居室之美

      项目价格暂未公布,请持续关注,板块内均价为84415元/㎡可供参考
  • 央行外汇占款与外汇储备并非完全对应

      小米汽车概念异动拉升,、、等涨幅居前。
  • 【晨报】黄金短线盘整,日内或涨至1222.00

      03/WACKOMARIAxWILDSIDEYohjiYamamoto