国产自拍👅_1区2区高潮-艺文笔记

王金豹 2026年02月04日 11:21:06
发布于:曼谷

国产自拍👅_1区2区高潮_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

4. Procedure _________  (Ref. Fig. 401/TASK 32-45-52-991-002) Subtask 32-45-52-020-050  A. Removal of the Rotary Switch  (1)  Remove the screw (5), the pin (4), and the knob (3).

 (2)  Loosen the four Dzus fasteners (2) from the panel 110VU (1) by a quarter turn.

 (3)  Lift the panel 110VU (1).

 (4)  Identify and disconnect the wires (9) from the rotary switch (8) with the applicable tool color white/red included in the ELECTRICIAN SERVICE TOOL KIT (DMC519).

 (5)  Remove the nut (6) and the washer (7).

 (6)  Remove the rotary switch (8).

 1EFF : ALL 1 32-45-52Page 402 1 1 Feb 01/98 1 1 1CES 1

 Parking Brake Control Switch  Figure 401/TASK 32-45-52-991-002  1EFF :  ALL  1  32-45-52 Page 403  1  1  Feb 01/98  1  1  1CES  1

 TASK 32-45-52-400-001  Installation of the Parking Brake Control Switch (73GG)  1. Reason for the Job __________________  Self Explanatory  2. Job Set-up Information ______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific pin DMC519 1 ELECTRICIAN SERVICE TOOL KIT  B. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 22-97-00-710-001 Operational Test of the LAND CAT III Capability 24-41-00-861-002 Energize the Aircraft Electrical Circuits from the External Power 24-41-00-862-002 De-energize the Aircraft Electrical Circuits Supplied from the External Power 29-24-00-863-001 Pressurize the Yellow Hydraulic System with the  Electric Pump 29-24-00-864-001 Depressurize the Yellow Hydraulic System 32-45-52-991-002 Fig. 401  3. Job Set-up __________  Subtask 32-45-52-865-051  A. Make sure that this(these) circuit breaker(s) is(are) open, safetied and tagged  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------121VU HYDRAULIC/PARK BRK/CTL/STBY 71GG N37 121VU HYDRAULIC/PARK BRK/CTL/NORM 70GG N36  1EFF : ALL 1 32-45-52Page 404 1 1 Feb 01/98 1 1 1CES 1

 4. Procedure _________  (Ref. Fig. 401/TASK 32-45-52-991-002) Subtask 32-45-52-420-050  A. Installation of the Rotary Switch  (1)  Make sure that the parts retained from the removed component are clean and in the correct condition.

 (2)  Install the rotary switch (8).

 (3)  Install the washer (7) and the nut (6).

 (4)  Connect the wires (9) to the rotary switch (8) with the applicable tool color white red included in the ELECTRICIAN SERVICE TOOL KIT (DMC519).

 (5)  Do an inspection of the component interface and/or the adjacent area.

 (6)  Install the panel (1) on the support (10).

 (7)  Tighten the four Dzus fasteners (2) on the panel (1).

 (8)  Install the knob (3), (in OFF position), the pin (4), and the screw (5).

 Subtask 32-45-52-861-050  B. Energize the aircraft electrical circuits. (Ref. TASK 24-41-00-861-002) Subtask 32-45-52-865-052  C. Remove the safety clip(s) and the tag(s) and close this(these) circuit breaker(s): 70GG, 71GG  1EFF : ALL 1 32-45-52Page 405 1 1 Feb 01/98 1 1 1CES 1 Subtask 32-45-52-720-050

 D. Test of the Rotary Switch  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. Pressurize the Yellow hydraulic system with the electric pump (Ref. TASK 29-24-00-863-001).  On the panel 400VU, on the Yellowpressure triple indicator 60GG, makesure that the pressure increases until 206 bar (3000 PSI) (the indicator pointer is in the green range).  2. Depressurize the Yellow hydraulic system (Ref. TASK 29-24-00-864-001).  3. On the panel 110VU, put the Parking Brake Control Switch 73GG in the ON position.  On the panel 400VU, on the Yellowpressure triple indicator 60GG, makesure that the Yellow pressure applied to the brakes increases.  On the nose gear leg, on the N/W steering deactivation electric-box 5GC, the parking brake indicator light is   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM LANDING GEAR 起落架8

原标题:
47 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 离岸人民币兑美元突破7.18元 创近六周新高

      值得一提的是,今年3月,股票型基金的新发规模相较1月至2月出现了较大的增长,多只A50ETF的首募规模超10亿元。随着这些基金陆续建仓,更多“子弹”将进入A股市场。
  • 11月16日 COMEX 12月期银未平仓合约减少4670手

      金价的持续上涨点燃了消费者的购买热情。世界黄金协会发布的《全球黄金需求趋势报告》显示,2023年,中国国内金饰消费金额达2820亿元,创历史新高。不过,该机构同时指出,虽然2024年一季度的金饰需求或许会由于春节假期前的销量增长而保持强劲,但全年的消费仍可能会因金价上涨、经济增长放缓以及婚庆用金需求减弱而面临挑战。
  • 开盘:沪指低开0.58%,光刻机、国资云、超导等板块指数跌幅居前

      安彩高科3月6日龙虎榜数据显示,近三个交易日内,上榜营业部席位合计成交8182.45万元,合计净卖出429.57万元。其中,沪股通专用账户买入880.08万元并卖出1449.35万元。据Choice数据,3月1日至3月8日,安彩高科沪股通账户累计减持230.48万股公司股份。
  • 年轻人的焦虑,撑起3000亿市场?

      在说明会上,阿斯利康管理层表示,最近的趋势表明,“拥有自给自足的供应链变得越来越重要,很多时候,公司因为供应投资不足而跟不上增长的雄心”。
  • 第九届SportIN体育潮流产业大会北京盛大开幕

      目前不仅药明康德,其他CRO公司的业务拓展也在放缓。在2023年前三季度,凯莱英营业收入较去年同期下滑18%,净利润下滑19%;博腾股份营收亦出现下滑,较去年同期降42%,净利润降71%;昭衍新药营收有所增长,但净利润下滑48%。
  • 你的婚姻能得多少分?

      埃里克-巴恩斯(ErikBarnes)收官第72洞也保帕,交出68杆。他的四轮成绩为269杆,低于标准杆19杆。
  • 美联储纪要发布前黄金上行空间可能有限

      养老社区为长者带来的不仅是生活中的照顾,更是心灵的陪伴。俞维美对此深有体会:“我之前一个人住在部队干休所,但找保姆什么挺麻烦的,找了保姆以后,他们过年过节都回家,我一个人也挺寂寞的。”而住在养老社区中,长者与工作人员都如家人般陪伴相处,“管家把我们老人当亲人一样。”
  • 开年经济表现如何?一组先行指数告诉你

      中小学生心理健康工作中,前期预防比后期干预更重要
  • “专家建议”,让我一天亏了20万

      早在2011年,长安汽车便设立了高端车事业部。尽管该部门随后解散,但也表明了长安进军高端市场的坚定决心。随着新能源时代到来,长安汽车在2017年4月就与蔚来签署了战略合作协议,并共同成立了“长安蔚来”平台,意图在抢先一步冲击高端新能源市场。然而,这次合作并未取得实质性的进展,最终在2020年宣告结束。
  • 争议!武磊禁区内被拉拽摔倒 裁判却未判点球

      截至2022年末,该公司资产总额56,070.48万元,负债总额60,229.35万元,净资产-4,158.87万元,2022年实现营业收入0万元,利润总额-4,331.44万元,净利润-4,331.44万元。
  • 2015年房地产仍是增长的主要拖累

      我曾经提过一个建议,就是在社区建立青少儿心理健康保健室,融教育心理学、生物心理学和医学心理学为一体,基于孩子的需要来提供心理健康教育或者影响,而不单是按照医学心理学给药,或者生物心理学从器质角度去考虑问题,同时也能避免教育心理学在医药方面的缺失。
  • 同样是怀孕,为什么是你“一孕傻三年”?原因很现实

      这部剧当中男女主角互换身份的设定,也给了演员很大的发挥空间。
  • 投资美股的九大理由

      今年全国两会,习近平总书记与代表委员共商国是,一次次仔细询问,一句句殷殷嘱托,凝聚起亿万人民一往无前的奋进力量。