免费精品综合导航👅_免费无毒AV网站久久-艺文笔记

王金豹 2026年01月29日 08:33:00
发布于:曼谷

免费精品综合导航👅_免费无毒AV网站久久_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

A 737-300/400/500MAINTENANCE MANUAL …..................................1  R = REVISED, A = ADDED OR D = DELETED CHAPTER 54 F = FOLDOUT PAGE EFFECTIVE PAGES 17 B PAGE 2 JUL 12/02 LAST PAGE

D6-37537 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. A 737-300/400/500MAINTENANCE MANUAL  CHAPTER 54 - NACELLES/PYLONS  TABLE OF CONTENTS _________________  Subject _______ NACELLES AND PYLONS ___________________  NACELLES/PYLONS _______________ Description and Operation NACELLE STRUT _____________ Description and Operation Removal/Installation Adjustment/Test Inspection/Check PINS - NACELLE STRUT ATTACH Removal/Installation Inspection/Check NACELLE STRUT - DRAIN TUBE AND SEALANT Inspection/Check Heat Shield Assembly Drain Check  Remove All Blockage From The Heat Shield Assembly Drain  Remove All Blockage From The Strut Midspar Closeout Web  Remove All Blockage From The

 BBEJ Page 1 Jul 15/97 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. A 737-300/400/500MAINTENANCE MANUAL  CHAPTER 54 - NACELLES/PYLONS  TABLE OF CONTENTS _________________  Chapter Section Subject_______ Subject ____ Effectivity _______ Page ___________  FAIRINGS - AFT 54-32-02 Removal/Installation 401 ALL DOOR - FORWARD FAIRING PRESSURE 54-33-01 RELIEF  Maintenance Practices 201 ALL Adjust Door 210 Install Door 209 Install Latch 207 Latch Free Play Adjustment 211 Latch Release Test 201 Remove Door 208 Remove Latch 207  ATTACH FITTINGS 54-40-00 _______________  ENGINE ATTACH FITTING 54-42-00  Description and Operation 1 ALL  FITTING - THRUST REVERSER HINGE 54-42-13

 Maintenance Practices 201 ALL MOUNT - AFT ENGINE 54-42-11 Maintenance Practices 201 ALL MOUNT - FORWARD ENGINE 54-42-12 Maintenance Practices 201 ALL  FAIRINGS 54-50-00 ________ FAIRINGS 54-51-00 FAIRING - INBOARD FLAP OUTBOARD 54-51-01 TRACK Maintenance Practices 201 ALL STRUT INSULATION BLANKETS 54-52-00 Maintenance Practices 201 ALL Firewall and Fireseal 201 Examination Approved Repairs 801 ALL

 BBEJ Page 2 Nov 15/96 BOEING PROPRIETARY - Copyright (C) - Unpublished Work - See title page for details. A 737-300/400/500MAINTENANCE MANUAL  NACELLES/PYLONS - DESCRIPTION AND OPERATION ___________________________________________  1.  General_______  A.  The engines are attached to the wing with struts (pylons). The strut is a pathway for all the pneumatic, electric, fuel, and hydraulic connections to the engine. The strut transfers loads from the engine and thrust reverser to the wing.  2.  Component Details_________________  A.  Strut Structure (Fig. 1)  (1)  Struts are essentially frame and skin structures attached by fasteners to form a torque box. Strut skins are aluminum. Bulkheads, mid and lower spars are made of steel. Stainless steel or titanium is used where high strength, heat and fire resistance are required.  B.  Struts are attached to the wing by means of the upper link between the strut upper spar and wing, the diagonal brace between the strut lower spar and wing, and the strut fittings connecting strut and wing directly. Side braces between strut midspar fittings and wing adds stability. Structural fuse pins or fuse bolts are used at the upper link, diagonal brace and midspar attach points.  C.  Struts transmit engine loads to the wing. The engine is attached at the strut at the forward and aft engine mounts and the thrust link fitting. The forward and aft engine mount transmit vertical and thrust loads to the strut. Torsional loads are transmitted through thrust links connected between the engine fan frame and strut lower spar.  D.  The engine and strut have outer skins which provide smooth airflow. The engine has a nacelle which is a streamlined enclosure. The nacelle consists of the inlet cowl, fan cowl, and thrust reverser. The strut has fairings which provide a smooth, contoured surface between the engine nacelle and wing.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:737-300 400 500 AMM 飞机维护手册 NACELLES/PYLONS

原标题:
24 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 陷入增长困境的宝尊电商还有能力收购雨鞋品牌Hunter吗?

      广州富力地产股份有限公司11日发布关于公司债券停牌的公告。公告称,为做好后续债务偿付安排,保证公平信息披露,保护广大债券投资者的利益,根据《上海证券交易所公司债券上市规则(2023年修订)》《上海证券交易所非公开发行公司债券挂牌规则(2023年修订)》等相关规定,经公司申请,“H16富力4”“H18富力1”“H19富力2”等债券自2024年3月11日开市起停牌。
  • 为啥入园第一年孩子爱生病?

      比如某品牌在垂媒大量投放线索广告,试图在固定转化率前提下,增加绝对转化量。试图在购买前阶段影响客户决策,好比在下游拦河筑坝。但社媒平台上却传出该品牌亏损多少、销量排行榜上位置不断下移、似真似假的用户不佳体验等,这时候品牌声望可能加速下移,相当于大径流、高落差的中游资源出了问题。在这里就设置拦阻线,更能从品牌端释放用户疑虑。
  • 探物志|新浪家居探访西安大明宫安吉尔旗舰店 开启健康舒适全屋净水生活

      一位国内人工智能方面的专家告诉上游新闻记者,目前主流的AI大模型平台并不是数学题库,“大数据模型一直在学习完善中,尤其是在数学和逻辑方面,所以很多产品对话框旁边都有点赞点踩的图标。通过这种方式反馈问题,模型才会学习完善。如果家长想要更精准的答案,更推荐给孩子使用学习机一类的AI产品。”
  • 机构:港股聚焦年报预喜+高分红的交集板块

      更多汽车资讯,涨知识赢好礼扫描二维码关注(auto_sina)加载中点击加载更多
  • 意甲女排斯坎迪奇0

      显然,炙手可热的商业化前景,建立在相应技术基础上的产业关联与集合推力,顶层设计与微观政策的强有力支持,供给侧市场主体创造性能量的集体迸发,多重积极因素的叠加与组合,势必牵引或驱动国内飞行汽车切入快车道,但同时也应当承认,产品正式成型并不代表着一定合格合规,成功首飞并不意味着具备正式航行资格,从设计、制造到成品下线与检测,再到出厂试飞以及最终的商用,飞行汽车必须经过十分严密的政策许可与标准指引,且大规模投入商用之前还有不少的技术性掣肘,尤其是飞行汽车启动载人服务可能还有不小的距离。
  • 羊城晚报:中国离拳王梦还很远

      值得关注的是,吉利汽车新能源和出口方面表现抢眼。其中,2月新能源销量为33508辆,同比增长约48%;2月海外出口销量为24373辆,同比增长39%。
  • 美渲染中国起重机安全威胁,振华重工回应:不会对任何港口构成网络安全风险

      1984年,小百花越剧团正式成立,当时何赛飞和茅威涛、何英、董柯娣、方雪雯被称为“五朵金花”。但彼时云集了全省精英的小百花越剧团面临的是人多戏少的局面,即使是团内的“五朵金花”之一,也没有足够多的演出机会,90年代初,何赛飞接连出演了《大红灯笼高高挂》《红粉》《风月》等第五代导演的电影,开始把工作重心转移到影视表演中。
  • 多重利好傍身,黄金牛市准备就绪

      来源|伯虎财经(bohuFN)
  • 兴业银行沈阳分行召开落实城市房地产融资协调机制专题会议

      商会常务会长、华鹤集团董事长吴雪松认为,这次会议开得非常及时。希望下一步能够推动各地、各部门就这两个文件进一步出台配套举措、实施意见。华鹤非常有信心把家电下乡这项工作进一步推动好。
  • 黄金日内交易分析:除非收盘跌破这一水平 否则继续看涨金价前景

      在外观方面,领克07EM-P使用了家族式的日行灯设计,双“h”的造型也是极具辨识度,并且作为一款轿车,整体的日行灯会更加向后延伸,从而带来更强烈的运动氛围。分体式的大灯组也是得到了保留,整体呈现为贯穿式的设计,在增加车辆层次感的同时也提升了整车的神秘韵味和科技属性。
  • 大宗商品价格是反弹不是反转

      信息传播率如何更大化
  • 预计2018年GDP增速放缓至6.4%

      14岁出国留学,2004年学成归国,在娃哈哈的车间做生产管理起步,后来又担任过娃哈哈集团公关部部长和集团副董事长,并主导了娃哈哈的品牌升级战略。
  • 李庚南:严监管才是市场最大的利好

      尽管2月新能源乘用车的零售量同比下降,但其在国内市场的渗透率已达到35.8%,相比去年同期的32%提升了3.8个百分点。
  • 大兴中建·玖玥府预计2023年12月16日开盘 装修交付

      首先是在业务布局上的超前投入。除了手机和电池,蔚来在换电上的大手笔也是经常为人所诟病。按照行业人士的曝光,尽管蔚来换电站的成本在不断下降,和第一代相比,蔚来的三代换电站成本已经从约300万元下降到了150万元。但截止去年11月,蔚来已建设换电站数量2217座,成本高达数十亿元。同时随着超冲技术的成熟,换电的实用性也在遭受质疑。