国内精品♨️_麻婆传媒在线观看网站免费-艺文笔记

王金豹 2026年02月04日 04:52:28
发布于:曼谷

国内精品♨️_麻婆传媒在线观看网站免费_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

 Subtask 29-11-52-865-050  C. Open, safety and tag this(these) circuit breaker(s):  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU HYD/FIRE VALVE/G/ENG1 1703GK C13 121VU HYDRAULIC/G HYD/PUMP ENG1/MONG 1702GK R34  **ON A/C 001-049, 051-061, 101-103, 201-203,  Subtask 29-11-52-010-050  D. Get Access  (1)  Put the access platform below zone 574.

 (2)  Open the access panels 574AB, 574BB.

 (3)  Put clean MISCELLANEOUS (Material No. 19-003) below the engine pump fire valve (5).

 (4)  Put a container below the access door opening, to collect the hydraulic fluid.

R **ON A/C 062-099, 104-149, 151-199, 204-299, 301-399, 401-499,  Subtask 29-11-52-010-050-A  D. Get Access  (1)  Put the access platform below zone 574.

 (2)  Remove the access panels 574AB, 574BB.

 (3)  Put clean MISCELLANEOUS (Material No. 19-003) below the engine pump fire valve (5).

 (4)  Put a container below the access door opening, to collect the hydraulic fluid.

 Engine Pump Fire-Valve (1046GK)  Figure 401/TASK 29-11-52-991-001- 12 (SHEET 1)  1EFF :  ALL  1  29-11-52 Page 404  1  1  Feb 01/98  1  1  1CES  1

 Engine Pump Fire-Valve (1046GK)  Figure 401/TASK 29-11-52-991-001- 22 (SHEET 2)  1EFF :  ALL  1  29-11-52 Page 405  1  1  Feb 01/98  1  1  1CES  1

R **ON A/C ALL  4. Procedure _________  (Ref. Fig. 401/TASK 29-11-52-991-001)  Subtask 29-11-52-020-050  A. Removal of the Engine Fire Pump-Valve  (1)  Disconnect the cable connector (1) from the electrical connector (2).

 (2)  Put blanking caps on the disconnected electrical connectors.

 (3)  Hold the engine pump fire-valve (5) and disconnect the coupling-nuts

 (4)  Compress the compensated slide (4) to decrease its length. Remove the engine pump fire-valve (5).

 (5)  Put blanking plugs on the disconnected line ends.

 TASK 29-11-52-400-001  Installation of the Engine Pump Fire-Valve (1046GK)  WARNING : MAKE SURE THAT THE FLIGHT CONTROL SAFETY-LOCKS AND THE WARNING

_______  NOTICES ARE IN POSITION.

 WARNING : MAKE SURE THAT THE GROUND SAFETY-LOCKS ARE IN POSITION ON THE LANDING _______  GEAR.

 1.  Reason for the Job

__________________  Self Explanatory

 2.  Job Set-up Information

______________________  A. Fixtures, Tools, Test and Support Equipment  -------------------------------------------------------------------------------REFERENCE QTY DESIGNATION ------------------------------------------------------------------------------- No specific safety barriers  No specific warning notice  No specific access platform 3 m (9 ft. 10 in.)

 B. Consumable Materials  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- Material No. 11-026 GB DEF-STAN 68-148/1 R SOLVENT GENERAL PURPOSE (Ref. 20-31-00) Material No. 19-003 USA AMS 3819 LINT-FREE COTTON CLOTH (Ref. 20-31-00)

 C. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- 29-00-00-864-001 Put the Related Hydraulic System in the Depressurized  Configuration before Maintenance Action 29-00-00-910-002 Safety Procedures of the Hydraulic System 29-10-00-720-001 Functional Check of Hydraulic Fire Shut-Off Valves 29-10-00-863-001 Pressurize the Green Hydraulic System 29-10-00-864-001 Depressurize the Green Hydraulic System 29-14-00-614-001 Depressurization of the Hydraulic Reservoirs 71-00-00-710-001 Dry Motoring Check 29-11-52-991-001 Fig. 401  3. Job Set-up __________  Subtask 29-11-52-941-060

 A. Safety Precautions  WARNING : OBEY THE HYDRAULIC SAFETY PROCEDURES.

_______  (1)  You must obey the hydraulic safety procedures (Ref. TASK 29-00-00-910-002) when you do work on the hydraulic system.   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM HYDRAULIC POWER 液压3

原标题:
64 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 月内董事长等两名高管接连辞职 年报披露在即云南白药管理层洗牌?

      李莉观察到,在一些农村中小学,校方、教师需要就手机问题与学生“斗智斗勇”;一旦放假,留守在家的祖辈缺乏管理意识与能力,一些少年儿童从早至晚“盯着手机不离手”,熬夜、通宵刷短视频或玩游戏。
  • 新春祈福一定要烧香才灵吗

      澳大利亚联邦银行首席执行官MattComyn再次对在澳大利亚支付市场的影响力发出警告,称该公司应该接受更多的审查。他指出,作为澳大利亚银行的合作伙伴和竞争对手,苹果不开放iPhone上的近场通信(NFC)功能,而是要求银行使用ApplePay进行支付。
  • 瓦工“行情”走俏 年收入或超25万元仍招不到人

      除了返利安排之外,宁德时代也在通过合作建厂,进一步加深与下游车企的绑定程度。上周五,北汽蓝谷刚刚披露了宁德时代北京电池工厂的最新进展。宁德时代、小米汽车、隶属北京能源集团的京能科技以及北汽蓝谷设立的平台公司北汽海蓝芯共同设立合资公司,在北京投资建设电芯工厂。相比于动力电池,电池电芯研发具有更高的技术难度。
  • 新中产家庭消费与理财报告:26%家庭年终奖预计超5万

      官方微博:@《剑侠世界3》手游新浪声明:新浪网登载此文出于传递更多信息之目的,并不意味着赞同其观点或证实其描述。
  • 泰森食品关闭爱荷华州工厂,1200多名员工失业

      在资本市场上,“做空”侵扰时有发生,这也是形成市场内在价格稳定机制的一股力量。
  • 巨乳症的危害 巨乳缩小的三个手术方案

      券商人士称,药明康德的耗资数十亿元回购的股份,均予以注销以减少注册资本。如此大手笔回购,大有助于提振公司内在价值,彰显公司未来发展信心。
  • 多位全国人大代表呼吁尽快修订《中国人民银行法》

      此外,阿维塔11千里智驾款搭载华为iTRACK开创性的智闭环架构,可以实现1秒万次超精细路况感知和1秒千次扭矩实时调节。同时,华为DriveONE基于自适应算法的“智调扭技术”将扭矩调节闭环速度提升了100倍,实现不同路况下的最佳动力输出模式,打造最佳驾驶感受。
  • 好看上头的时尚感发饰 女明星都种草了

      自华为剥离,算力龙头超聚变来头不小
  • 豆瓣评分跌至5.6 吴京怪兽新片《巨齿鲨2:深渊》票房破5亿

      2024年刚进入第三个月,公募基金业绩首尾差异就已经超过了64个百分点,截至3月8日,今年以来跌幅最多的小微盘风格基金收益为-35.04%,而收益最高的基金已经上涨了29.85%。
  • 黄金ETF成交量创新高,黄金触底信号强烈

      这些楼盘的详细信息如下:
  • 美联储“鸽声”令市场欣喜 年末行情能否更进一步

      除此之外,瑞典选手卢德维格-阿伯格(LudvigAberg)并列位于25位,获得2.39944分,世界排名首次突破前十位,从11位上升到第十位。马特-菲茨帕特里克(MattFitzpatrick)跌出前十位,排名11位。
  • 男粉冲上台被保安迅速处理 张靓颖暖心反应获赞

      在吴月看来,贵金属相关业务指标近期完成得特别快。此前借着“龙年黄金”“银行购金打金镯”的热度,已有部分客户购入实体黄金。现在金价狂涨背景下,部分客户基于投资需求,也更容易选择买入积存金。
  • 恭迎准提菩萨圣诞吉日

      本报也了解到,在坚持《总体方案》同时积极鼓励俱乐部招商引资的双重考虑下,年初中国足协和中足联筹备组修订了《职业足球俱乐部和球队名称管理规定》,并组织了全体中超俱乐部研讨,综合各方意见出台了《名称使用实施细则》,对于球队名称使用,做出了相关规定。在长挂时钟角标的问题上,中足联筹备组还在制定规定前安排了制作中心模拟了9个字甚至更多字符时的情况,但转播效果非常不好。最终综合考虑转播效果和俱乐部公平等各方面原因后,确定以6个汉字为上限。
  • 前瑞信首席执行官称他将竞选科特迪瓦总统

      市场上两只黄金股ETF也表现强劲,涨幅均超过4.5%。此外,跟踪黄金现货走势的黄金ETF纷纷上涨,多只产品涨幅超过1%。
  • 任泽平点评意大利公投失败:利空欧元 利多美元

      安彩高科进一步强调,公司近期日常经营情况及外部环境未发生重大变化。公司所处的市场环境、行业政策目前未发生重大调整,生产成本目前没有出现大幅波动,内部生产经营秩序正常。2024年1-2月份,光伏产品售价较去年同期下降约16%。公司预计2023年亏损1500万元至3000万元。