在线看免费❗_久久草免费线看线看2-艺文笔记

王金豹 2025年12月24日 06:09:20
发布于:曼谷

在线看免费❗_久久草免费线看线看2_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

TASK 27-00-00-810-801  Display of an Operational Warning on the Upper ECAM DU

 1. Possible Causes _______________  - Message on the Post Flight Report (PFR)  2. Job Set-up Information

______________________  Not Applicable

 3. Fault Confirmation

__________________  A. Test  Not applicable, no confirmation test is necessary.

 4. Fault Isolation _______________  A. Do a check for a Message on the Post Flight Report (PFR).  If there is no message, no action is necessary. R If there is a message, do the trouble shooting procedure related to the R maintenance message.  NOTE : Some operational Warnings are not printed on the PFR. ____

 AILERON - FAULT ISOLATION PROCEDURES ____________________________________  TASK 27-10-00-810-801  Loss of Signal on the Left Pedals for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - XDCR UNIT-PEDAL POS, L (25CE1)

 - wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit  (25CE1,25CE2)  AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23  3. Fault Confirmation __________________  A. Test  (1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

 (2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

 4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR INPUT OF L PEDALS XDCR UNIT 25CE1

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:  - replace the XDCR UNIT-PEDAL POS, L (25CE1), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).  「一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一一1 EFF : ALL ∞∞27-10-00∞∞∞∞∞∞∞∞∞∞Page 201  May 01/00 CES (2) If the fault continues:

 - do a check and repair the wiring from the ELAC 1 (2CE1) to the transducer unit (25CE1) (Ref. ASM 27-92/23).  B. Do the operational test and the BITE test given in Para. 3.

 Loss of Signal on the Right Pedals for the ELAC 1  1. Possible Causes _______________  - ELAC-1 (2CE1)

 - XDCR UNIT-PEDAL POS, R (25CE2)

 - wiring from the ELAC 1 (2CE1) to the transducer unit (25CE2)

 2. Job Set-up Information ______________________  A. Referenced Information  -------------------------------------------------------------------------------REFERENCE DESIGNATION ------------------------------------------------------------------------------- AMM 27-24-00-710-001 Operational Test of the Rudder Hydraulic Actuation AMM 27-92-15-000-001 Removal of the Pedal Position Transducer Unit (25CE1,25CE2) AMM 27-92-15-400-001 Installation of the Pedal Position Transducer Unit  (25CE1,25CE2)  AMM 27-93-34-000-001 Removal of the ELAC (2CE1,2CE2)  AMM 27-93-34-400-001 Installation of the ELAC (2CE1,2CE2)

R  AMM 27-96-00-740-001 BITE Test of the EFCS (Ground Scanning) ASM 27-92/23  3. Fault Confirmation __________________  A. Test  (1) Do the operational test of the rudder hydraulic actuation (Ref. AMM TASK 27-24-00-710-001).

 (2) Do the BITE test of the EFCS (Ground Scanning) (Ref. AMM TASK 27-96-00-740-001).

 4. Fault Isolation _______________  A. If the BITE test gives the maintenance message:  ELAC1 OR INPUT OF R PEDALS XDCR UNIT 25CE2

 - replace the ELAC-1 (2CE1), (Ref. AMM TASK 27-93-34-000-001) and (Ref. AMM TASK 27-93-34-400-001).  (1) If the fault continues:

 - replace the XDCR UNIT-PEDAL POS, R (25CE2), (Ref. AMM TASK 27-92-15-000-001) and (Ref. AMM TASK 27-92-15-400-001).   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320 Trouble Shooting Manual 排故手册 飞行操纵 1

原标题:
84 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 王传福:消费者的环保意识和政府的政策体系 成就了中国新能源汽车

      2022年营收高达1571亿的厨房食品业务,利润却只有104.9亿元,毛利率为6.68%。
  • 小S穿拖鞋模仿梦露凹造型 身材玲珑有致似少女

      瑞银集团声明表示,未与任何培训单位、团体、个人有内部推荐简历的合作关系,也从未编辑、出版或发布过任何招聘考试参考资料。瑞银集团UBSCareers官网是本集团在中国内地的唯一官方招聘渠道,请有意应聘瑞银集团的申请者通过官方渠道申请职位,谨防欺诈行为。瑞银集团保留追究不实信息发布人法律责任的权利。
  • 千余家A股发布业绩快报

      华泰证券也声明,“华泰证券招聘官网为校园招聘简历接收的唯一官方渠道。暑期实习及校园招聘项目,与第三方的合作仅限于招聘宣传,不接收任何第三方机构的简历推荐。”
  • 任泽平:两会传递出新时代重大信号

      热播剧往往需要付费观看商家售卖剧集并发展代理
  • 岩板瓷砖胶方案,柔韧性有多好?

      周一,美国2月纽约联储1年通胀预期值录得3.04%,略超前值,通胀压力仍存。此外,美国10年期国债收益率止跌,出现小幅回升;2年期国债收益率连续两日上涨,或有企稳趋势,利率走势或出现异动。同时,美元指数结束七连阴,于周一收涨,承压。据CMEFedWatch工具显示,当前市场对美联储6月开始降息的押注超70%,市场情绪积极。美联储官员古尔斯比明确表示,随着通胀下行,利率将会下降,降息预期再受鼓舞。在3月19日至20日货币政策会议前,美联储处于缄默期,市场交易情绪主要受经济数据牵引,市场聚焦周二将公布的CPI数据。若CPI数据攀升,短期金价走势或遭破坏,需关注回调风险。综合来看,通胀预期、国债收益率及美元指数的回升打压金价强势上涨势头,短期金价冲量上行乏力。但明显利空因素有限,料金价维持偏强震荡趋势,重点关注周二即将公布的最新通胀数据。
  • 部分ETF期权新品种或近期推出

      步入房间,映入眼帘的是整洁温馨的室内环境和俞维美老人热情的笑容。作为曾参加过抗美援朝的老兵,九十逾岁的俞维美仍然精神矍铄、步伐稳健。尚在青年时期,俞维美就坚定了从军志向,从师范学校毕业后,她偷偷从家里跑出来,走了两百多里路考入杭州华东军政大学(浙江分校),开始了伟大的军旅生涯。
  • 股市杠杆到底该怎么管?

      即便不考虑上述成本,积存金也并未稳赚不赔。作为投资产品,黄金的实际价格波动较大。例如,在2023年9月中旬达到阶段性高点后,9月25日至10月5日,纽约商品交易所黄金期货市场交投最活跃的12月黄金期价连续9个交易日下跌,累计下跌113.8美元/盎司,跌幅为5.85%。
  • 西安交通大学2018年新增人工智能和大数据专业

      当汽车资讯被当做获客为主要目的的线索营销,内容不可避免被“广告化”。平台氛围改变了之后,用户并不会马上离开。只有原来积累的忠诚度被消耗完毕之后,才会逃离。一旦离开,平台就再无机会修复与用户的连接。
  • 中国体育报:为排球联赛教练流动点个赞

      根据官方数据显示,长安汽车新能源及海外销量表现亮眼,1-2月长安汽车自主品牌新能源累计零售89374辆,同比增长119.1%;自主品牌海外零售量为75661辆,同比增加106.2%。
  • 南国置业以资产抵债、业绩预亏 存量房转为租赁等方式应对效果几何?

      为什么随遇而安的她能留下经典的角色,还在60岁的年纪拿下影后?何赛飞有自己的不可取代性——
  • 农业农村部:上海市金山区排查出非洲猪瘟疫情

      3、股东根据获取的服务密码或数字证书,可登录网址在规定的时间内通过深交所互联网投票系统进行投票。
  • 门窗快讯|新豪轩门窗华中一号店开展周年庆典

      科学家新发现超过100个影响人类发色的基因位点为更精准的法医DNA表型刻画提供可能图为用于全基因组关联分析的头发颜色分类中科院供图
  • 越郡佳山水 菁江接上虞

      从两年多前就被我‘狂吹’的adidas,看来是打算在复古运动上一条道‘走到黑’了,但也不得不说,做起复古运动来,adidas真是没得挑,本次与曼联以及传奇乐队TheStoneRoses的三方合作系列,真有那个味儿啊~就是有点儿像毛子?