深夜福利✅_中国12区在线观看-艺文笔记

王金豹 2025年11月08日 03:01:42
发布于:曼谷

深夜福利✅_中国12区在线观看_.手.动.输.入.网.址.联.系.客.服.人.员.lanan_shell

B. Aircraft Maintenance Configuration  (1)  Energize the aircraft electrical circuits (Ref. TASK 24-41-00-861-002).

 (2)  Do the EIS start procedure (ECAM only) (Ref. TASK 31-60-00-860-001).

 4. Procedure _________ R **ON A/C 001-049, 051-099, 101-149, 151-199, 201-299, 401-499,  (Ref. Fig. 501/TASK 28-24-00-991-002)  **ON A/C 301-399,

 (Ref. Fig. 501A/TASK 28-24-00-991-002-A)  **ON A/C ALL

 Subtask 28-24-00-865-063  A. Make sure that this(these) circuit breaker(s) is(are) closed:  -------------------------------------------------------------------------------PANEL DESIGNATION IDENT. LOCATION -------------------------------------------------------------------------------49VU FUEL/LP VALVE/MOT1/ENG2 2QG A09  49VU FUEL/LP VALVE/MOT1/ENG1 1QG A08 121VU FUEL/LP VALVE/MOT2/ENG2 4QG M26 121VU FUEL/LP VALVE/MOT2/ENG1 3QG M25  1EFF : ALL 1 28-24-00Page 505 1 1 Aug 01/05 1 1 1CES 1 Subtask 28-24-00-710-053

 B. Test of the Valve 12QM valve  -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 2 SUPPLY and  circuit breaker 3QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL pushbutton  - the FUEL system page shows  switch (P/BSW).  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 2 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 3QG.  6. On the panel 49VU:  - open, safety and tag the  The ENG 1 LP valve MOTOR 1 SUPPLY and  circuit breaker 1QG.  CONTROL are isolated.  On the ECAM lower DU:  - the LEFT LP valve indication shows  the valve closed (amber cross-line).  7. On the panel 115VU:  On the ECAM lower DU:

 1EFF : ALL 1 28-24-00Page 506 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT ------------------------------------------------------------------------------- - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the ON position.  the valve open (green in-line).  8. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 1 switch to  - the LEFT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  9. On the panel 49VU:  - remove the safety clip and the  The ENG 1 LP valve MOTOR 1 SUPPLY and  tag and close the circuit  CONTROL are energised.  breaker 1QG.  Subtask 28-24-00-710-054  C. Test of the Valve 13QM

 -------------------------------------------------------------------------------ACTION RESULT ------------------------------------------------------------------------------- 1. On the panel 121VU:  - open, safety and tag the  The ENG 2 LP valve MOTOR 2 SUPPLY and  circuit breaker 4QG.  CONTROL are isolated.  2. On the ECAM CP:  On the ECAM lower DU:  - push (in) the FUEL P/BSW.  - the FUEL system page shows  - the RIGHT LP valve indication shows  the valve closed (amber cross-line).  3. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the ON position.  the valve open (green in-line).  4. On the panel 115VU:  On the ECAM lower DU:  - put the ENG/MASTER 2 switch to  - the RIGHT LP valve indication shows  the OFF position.  the valve closed (amber cross-line).  5. On the panel 121VU:

 1EFF : ALL 1 28-24-00Page 507 1 1 May 01/04R 1 1 1CES 1

 ------------------------------------------------------------------------------- ACTION RESULT -------------------------------------------------------------------------------   www.aero.cn 航空翻译 www.aviation.cn 本文链接地址:A320飞机维护手册 AMM FUEL 燃油4

原标题:
23 个人收藏 收藏

评论交流

这位访客请「登录」后参与评论

相关推荐

  • 汪涛:债务危机风险已经有所下降

      与华为合作造车,对于江淮来说不算是一个坏消息。
  • 王永利:金价大涨,央行还会继续买入吗

      但在当时,AI技术最大的应用落地场景并不是虚拟助手,而是自动驾驶。
  • 黄金出现买入信号,第一目标见1208.32

      综合多方面的内外部因素,涂料行业不能再用“老配方”应对新行情。面对这样的市场变化,既要开启创新之路寻找新的生存点又要基于环保政策向着诗意、绿色栖居地前进,那么,涂料行业将会共同绘制出一张怎样的新生态蓝图呢。在此背景下,5月27日下午,新浪家居与中国建筑装饰装修材料协会建筑涂料分会联合举办的行业论坛线上沙龙圆满成功。以“创新蓝涂筑牢诗意栖居”为主题,围绕“全新调整”、“创新蓝涂”、“刷新业态”三大议题,探讨建筑涂料行业的“三新”破局之路,共话行业未来“新业态”。
  • 首家无人银行来了!没有工作人员 什么业务不能办?

      元UP尾灯以一条贯穿式光带横跨整个车尾,在两侧的造型上呈现“8”字,也像一个莫比乌斯环,代表着一个完整、闭合的循环,如同无穷无尽的“幸运环”,象征生活的圆满和完美。
  • 光大期货:3月12日能源化工日报

      近两年来,Quest头显为应用程序数据(包括游戏保存)提供了自动云备份系统。
  • 国家安全部:斩断境外伸向我种质资源的窃密“黑手”

      此外,考虑到iPhone目前在市场上受到的冲击,就算是体量目前较小,苹果也的确应该加速折叠屏产品的落地量产。郭明錤表示,此前2024年iPhone出货的市场共识为2.2-2.25亿部,现在已经开始下修,并向自己之前预测的2亿部靠拢。郭天翔则指出,折叠屏这种在产品形态有较大改观得产品,更容易引起消费者得关注,激发换机欲望。
  • 快讯:焦炭跌幅超3%

      目前,整个折叠屏行业仍在狂奔,只是苹果当下的“窘境”,更为重要的可能是解决欧盟罚款的问题,以及加速AI上的进程。至于折叠屏,市场希望的是不“跳票”就好。毕竟,十年造车计划都能放弃,可折叠iPhone更是要打一个大大的问号了。股市回暖,抄底炒股先开户!智能定投、条件单、个股雷达……送给你海量资讯、精准解读,尽在新浪财经APP文章关键词:VIP课程推荐加载中...收起@@title@@APP专享直播1/10热门推荐收起新浪财经公众号
  • 分析师:多头请三思 黄金可能还没筑底

      麦克罗伊最后一轮只打出76杆,四轮287杆(73-70-68-76),低于标准杆1杆,并列位于21位。
  • 2023艺体化年终盛典 为体教融合继续添砖加瓦

      新酷产品第一时间免费试玩,还有众多优质达人分享独到生活经验,快来新浪众测,体验各领域最前沿、最有趣、最好玩的产品吧~!下载客户端还能获得专享福利哦!
  • 黄金时间·铂金60秒:受供应下降影响 2024年铂金市场仍将保持13吨的短缺

      经中国家居产业发展峰会组委会研究决定,特聘中国室内装饰协会副会长、中国家居产业发展峰会大雁奖组委会荣誉主席田万良,中国家居产业发展峰会大雁奖组委会主席魏晓飞,中国建筑材料流通协会会长秦占学,全国工商联家具装饰业商会秘书长张仁江,中国陶瓷工业协会副理事长兼秘书长侯文全,中国林产工业协会驻会副会长代秘书长陈天全,中国木材与木制品流通协会会长李佳峰,北京家居行业协会常务副会长兼秘书长刘晨,中国家用电器协会副理事长徐东生,中国家用纺织品行业协会副会长吴永茜,中国房地产协会内装委员会秘书长陈琬,广东省家居业联合会执行会长蒋德辉,为产业发展战略及行业评审专家。
  • 国内配件商自曝iPhone 13/Pro系列保护壳生产模具

      “我们认为AI分四层。一层是在系统层,就是跨设备、跨操作系统,用AI来使能。我们说不同的操作系统用AI来做决策,你有安卓的操作系统,有Windows操作系统还有IoTLiteOS相应的操作系统,当你用AI统一大脑来决策的时候,资源是向消费者或者向使用者来进行聚集的,这是跨设备的系统级AI。
  • 亲戚朋友再这样夸孩子,我就要生气了!

      在哈林星球上,超人们除了使用水泡对抗宇宙资源公司,在平日里最喜欢玩的就是“超人快跑”啦!